|
Information Center:
Study Documents
Throughout the duration of the U.S. 52/IL 64 Over the Mississippi River Phase I Study, project documents will be posted to the website. These documents may include: draft and final reports, study area maps, presentations, and communication pieces such as, FAQ’s, glossary of terms, and project photos and graphics.
Information will be posted as it becomes available.
Public Open House Meeting #1:
Media Center
Press Releases
Press releases will be posted to this site as they become available.
Contact Us
As the U.S. 52/IL 64 Over the Mississippi River Phase I Study progresses, we will regularly update this website to
ensure you are kept informed of our progress. The study team is interested in hearing your ideas and opinions! If you
have questions or comments about the study, please fill out the
Question/Comment Submittal Form, or write us at:
Paul A. Loete, P.E.
Deputy Director of Highways
Region Two Engineer
Illinois Department of Transportation
819 Depot Avenue
Dixon, Illinois 61021-3500
|