During the storm sewer main construction, the railroad ties from the interurban rail line were uncovered. When the rail line was abandoned, the next layer of pavement was built on top of the railroad ties. The rails had been removed. |
|
The new storm sewer main was built in the center
of Main Street. This worker is backfilling and compacting the
trench between Hazel and Vermilion. The new manholes can be
seen here also. |
|
The storm sewer main is being built in the center
of Main Street. The trench is being backfilled and compacted. |