CONSTRUCTION UPDATE REPORT
North Cook
Effective: 02/07/12 4:26 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
Algonquin Road, Golf Road and New Wilke Road Lighting system |
Rolling Meadows 1/2011 6/2012 $1.828 |
IMPACT ON TRAVEL:
63426 Installation of a complete lighting system, foundations, poles, luminaires unit duct and lighting controllers on Algonquin Road from east of IL Route 53 to west of Arlington Heights Road and work will occur on Golf Road and New Wilke Road near Algonquin Road, located in the City of Rolling Meadows. |
|
Along Frontage Road & along Higgins Road. Bike path and traffic signals |
Schaumburg 6/2011 12/2011 $0.637 |
IMPACT ON TRAVEL:
63355 Construct an HMA bike path, storm sewer, traffic signal improvements and landscaping, from the intersection of Frontage Road and Springinsguth Road along the Frontage Road and Irving Park Road for 0.97 miles ending at Wright Boulevard, and along the south side of Higgins Road, just west of Verde Drive east to Del Lago Drive for 0.10 miles, located in the Village of Schaumburg. |
|
Belmont Avenue Colored concrete, decorative lighting, and planters |
Elmwood Park 10/2011 6/2012 $0.392 |
IMPACT ON TRAVEL:
63608 Project consists of curb and gutter removal and replacement, pavement removal, PCC sidewalk removal and replacement, decorative lighting, colored tamped concrete, planters, HMA surface course, polymerized leveling binder, storm sewer, pavement striping, and all other incidental items to complete the work on Belmont Avenue from 77th Court to 76th Court in the Village of Elmwood Park. |
|
Canfield Avenue Reconstruction of roadway, lighting, and landscaping. |
Norridge 4/2012 8/2012 $0.923 |
IMPACT ON TRAVEL:
63631 This project consists of reconstruction of roadway with new full-depth HMA, curb and gutter, driveway and sidewalk removal and replacement, roadway lighting, landscaping and pavement marking located on Canfield Avenue from Montrose Avenue to Lawrence Avenue in the village of Norridge. |
|
Chicago Avenue Curbs, sidewalk, and landscaping. |
Evanston Aparil 2012 June 2012 $0.693 |
IMPACT ON TRAVEL:
63593 This project consists of removal and replacement of curbs, pavement and sidewalk, landscaping and construction located on Chicago Avenue from South Boulevard to Main Street in the City of Evanston. |
|
Children's Learning Center (Village of Glencoe) Remove stone parking lot, constructing new drive/entryway |
Glencoe 7/2010 12/2011 $0.698 |
IMPACT ON TRAVEL:
Project consists of removing an existing stone parking lot and constructing a new drive/entryway including excavation, paving, drainage, curb and gutter, landscaping and all other incidental items to complete the work at the Children's Learning Center at the Chicago Botanic Garden in the Village of Glencoe. |
|
Compass Rd and Lehigh Ave./Lehigh Ave & West Lake Parking lot improvements |
Glenview 10/2010 5/2012 $1.661 |
IMPACT ON TRAVEL:
63360 Project consists of parking lot improvements including HMA surface course, sidewalk replacement, pavement markings and all other incidental items to complete the work at the intersection of Compass Road and Lehigh Avenue and at the intersection of Lehigh Avenue and West Lake in the Village of Glenview. |
|
Dempster Street Pavement resurfacing and patching, curb and gutter, sidewalk |
Morton Grove 7/2010 12/2011 $4.776 |
IMPACT ON TRAVEL:
83971 Improvement consists of 0.94 miles of pavement resurfacing, pavement patching, thermoplastic pavement marking, curb and gutter, sidewalk, modernizing traffic signals, streetscaping, lighting and landscaping on FAU Rte. 1324 (Dempster Street) from Ferris Avenue to Central Avenue in Morton Grove. |
|
Diversey, Derrough, and Rhodes Ave. Resurfacing and landscaping |
Northlake 8/2011 12/2011 $0.246 |
IMPACT ON TRAVEL:
63559 Project consists of pavement removal, installation of curb and gutter, PCC sidewalk, driveway removal and replacement, aggregate base course, HMA surface course, HMA binder course, pavement striping, landscaping restoration and all other incidental items to complete the work on Diversey Avenue, Derrough Avenue and Rhodes Avenue between Pearl Street and Westdale Elementary School in the city of Northlake. |
|
Fullerton Avenue Culvert replacement |
Franklin Park 9/2011 6/2012 $1.376 |
IMPACT ON TRAVEL:
60M82 Culvert replacement at the structure carrying Fullerton Avenue from Silver Creek Road to Ruby Street in the Village of Franklin Park. |
|
Grand Avenue New brick sidewalk, curb & gutter, storm sewers, restoring grass parkways. |
River Grove 5/2011 12/2011 $0.905 |
IMPACT ON TRAVEL:
63511 Project consists of the removal of the existing sidewalk, curb and gutter, driveway aprons and grass parkways, installation of new brick paver sidewalk, concrete sidewalk, curb and gutter, driveway aprons, private entrance sidewalks, installation of storm sewers and drainage structures, restoring the grass parkways with topsoil and sod and all other incidental items to complete the work on Grand Avenue from the Des Plaines River Bridge to Davisson Street in the Village of River Grove. |
|
Green Leaf and IL 83 (Busse Ave) Widening, traffic signals. |
Elk Grove Village 4/2011 5/2012 $3.455 |
IMPACT ON TRAVEL:
63527 Reconstruct the intersection at Green Leaf Avenue, to include pavement widening, resurfacing, traffic signal replacement and the relocation of the existing street lighting, located in the Village of Elk Grove Village. |
|
Greenwood Road and Glenview Road Roadway widening and resurfacing, storm sewers and watermain, curb and gutter, traffic signal modernization |
Glenview 7/2010 5/2012 $3.855 |
IMPACT ON TRAVEL:
63383 Project consists of roadway widening and resurfacing, construct storm sewers and watermain, PCC base course widening, HMA binder and surface courses, curb and gutter, sidewalks and traffic signal modernization, located on Greenwood Road from 1,480 feet south of Glenview Road to 1,400 feet north of Glenview Road and on Glenview Road from 460 feet west of Greenwood Road to 480 feet east of Greenwood Road, located in the Village of Glenview. |
|
Harrison Road Resurfacing |
Forest Park 9/2011 5/2012 $0.409 |
IMPACT ON TRAVEL:
63602 Project consists of resurfacing the street including surface removal, leveling binder, surface course, combination concrete curb and gutter removal and replacement, driveway removal and replacement, structure adjustments, restoration, and all other incidental items to complete the work on Harrison Road from Des Plaines Avenue to Harlem Avenue in the village of Forest Park. |
|
I-90 at I-294 Replacement of an existing storm water pump station. |
Rosemont 2/2011 2/2013 $10.354 |
IMPACT ON TRAVEL:
62392 Removal and replacement of an existing storm water pump station draining I-90 at I-294 in Rosemont |
|
IL 21 Streetscape, landscaping, and traffic signals |
Niles 5/2012 8/2012 $1.954 |
IMPACT ON TRAVEL:
63622 Project consists of streetscape, landscaping, traffic signal modifications, lighting improvements and all other incidental items to complete the work on IL 21 between Birchwood Avenue and Monroe Street in the Village of Niles. |
|
IL 53 Extension Noise abatement wall |
Palatine 9/2011 6/2012 $0.888 |
IMPACT ON TRAVEL:
60P26 Noise abatement wall repairs on IL 53 Extension from IL 68 to Lake Cook Road in Palatine. |
|
IL 59 Roadway lighting and landscaping |
Bartlett 11/2011 8/2012 $0.498 |
IMPACT ON TRAVEL:
63512 This project consists of 5,092 feet of construction of roadway lighting and landscaping, from IL Route 59 to Western Avenue in the village of Bartlett. |
|
IL 59 at US 20 Channelizaation for the intersection |
Streamwood and Bartlett 8/2011 12/2011 $0.665 |
IMPACT ON TRAVEL:
60K62 Channelization for the intersection of Il Route 59 at US route 20 in Streamwood and Bartlett. |
|
IL 62 Tree removal |
South Barrington 9/2011 5/2012 $0.142 |
IMPACT ON TRAVEL:
60P52 Tree removal along IL 62 from Eastings Way to Penny Road in South Barrington. |
|
IL 62 (Algonquin Rd.) Bridge deck replacement |
Rolling Meadows 3/2011 12/2011 $1.622 |
IMPACT ON TRAVEL:
60J00 Bridge deck replacement and raising of existing vertical profile for the structure carrying IL Route 62 (Algonquin Road) over Salt Creek located 0.7 mile east of IL Route 53 in Rolling Meadows. |
|
IL 62 (Algonquin Road) Construction of additional lanes, and retaining walls. |
South Barrington 4/2012 10/2012 $7.661 |
IMPACT ON TRAVEL:
60J35 Bridge beam and deck replacement for the structure carrying Shermer Road over the Middle Fork north branch of the Chicago River in Northbrook |
|
IL 68 (Dundee Road) Bridge replacement over the Wheeling Drainage Ditch |
Wheeling 5/2011 4/2012 $2.179 |
IMPACT ON TRAVEL:
60H20 Water main relocation and replacement of the existing structure carrying IL Route 68 (Dundee Road) over the Wheeling Drainage Ditch with a three-sided precast concrete structure 36' X 11', located west of Dundee Road and Wolf Road in Wheeling. |
|
IL 72 Bike path, drainage,pedestrian bridge, traffic signals. |
Hoffman Estates $0.639 |
IMPACT ON TRAVEL:
63233 Project consists of sidewalk, bike path, grading, drainage, pedestrian bridge, traffic signal modification and other incidental items to complete the work on IL 72 from Golf Road to Plum Grove Road in the Village of Hoffman Estates |
|
Irving Park Road Channelization and traffic signals |
Hanover Park 9/2011 6/2012 $0.658 |
IMPACT ON TRAVEL:
60l23 Channelization and traffic signal modernization on Irving Park Road at Barrington Road in Hanover Park. |
|
Irving Park Road (IL 19), Lake St (US 20) Safety traffic upgrades, traffic signal modernization |
Streamwood, Hanover Park & Bartlett 3/2011 12/2011 $0.718 |
IMPACT ON TRAVEL:
60K23 Safety traffic upgrades including traffic signal modernization, temporary traffic signals and interconnect on IL 19 (Irving Park Road) from East Avenue to Bartlett Road and US 20 (Lake Street) at Park Avenue in Streamwood, Hanover Park and Bartlett. |
|
Lawrence Avenue Traffic signal closed loop system. |
Schiller Park 11/2010 12/2011 $0.99 |
IMPACT ON TRAVEL:
60I65 New traffic signal closed loop system on Lawrence Avenue from 25th Avenue to Des Plaines River Road including the signalized intersections of 25th Avenue, Forester Road, and Des Plaines River Road in Schiller Park. |
|
Lincoln Avenue Resurfacing |
Morton Grove and Skokie 9/2011 12/2011 $0.374 |
IMPACT ON TRAVEL:
60M19 0.51 mile of resurfacing on Lincoln Avenue from Linder Avenue to Main Street in Morton Grove and Skokie. |
|
Miner Street (various routes) Lighting and streetscape. |
Des Plaines 5/2010 10/2011 $1.073 |
IMPACT ON TRAVEL:
63041 1.63 miles lighting and streetscape including concrete island replacement and benches on Miner Street, between Graceland and Des Plaines River Road; Oakton/Lee, Oakton/River, Oakton/White Corners; Lee/Algonquin & Lee in Des Plaines. |
|
Montrose Avenue Resurfacing |
Norridge 8/2011 12/2011 $0.816 |
IMPACT ON TRAVEL:
63582 Project consists of intermittent replacement of defective curb and gutter, sidewalks, pavement patching, HMA surface removal, various utility structure adjustments, resurfacing with leveling binder and HMA surface course, pavement striping and all other incidental items to complete the work on Montrose Avenue from Canfield Avenue to Sayre Avenue in the Village of Norridge. |
|
On the North side of Davis Street Fence, landscaping and sidewalk construction |
Arlington Heights 5/2012 6/2012 $0.41 |
IMPACT ON TRAVEL:
63615 This project consists of sidewalk construction, fence removal and replacement and landscaping on the north side of Davis Street between Pine Avenue to Bristol Lane in the Village of Arlington Heights |
|
Plum Grove Road Street lighting |
Schaumburg 5/2011 6/2012 $0.192 |
IMPACT ON TRAVEL:
63564 Street lighting improvements consisting of directional boring street lighting cable, foundation installation, street light pole assembly and installation and all other incidental items to complete the work on FAU Route 2582 (Plum Grove Road) from Schaumburg Road to Stonewall Court within Schaumburg. |
|
Plum Grove Road Pedestrian Path |
Rollling Meadows 4/2012 6/2012 $0.89 |
IMPACT ON TRAVEL:
63356 Construct a HMA Pedestrian Path on an aggregate base, adjacent to Plum Grove Road from Kirchoff Road to Bryant Avenue in the City of Rolling Meadows |
|
Pratt Boulevard and Busse Rd (IL 83) Reconstruction of the intersection |
Elk Grove Village 4/2011 6/2012 $3.043 |
IMPACT ON TRAVEL:
63523 Reconstruct the intersection at Pratt Boulevard and Busse Road (IL 83), to include pavement widening, resurfacing, storm sewer installation, traffic signal replacement and the relocation of the existing street lighting, located in the Village of Elk Grove Village. |
|
Shermer Road Bridge deck replacement |
Northbrook 4/2012 8/2012 $0.364 |
IMPACT ON TRAVEL:
60M80 Bridge beam and deck replacement for the structure carrying Shermer Road over the Middle Fork north branch of the Chicago River in Northbrook |
|
State Parkway Resurfacing, curb and gutter |
Schaumburg 5/2012 8/2012 $1.064 |
IMPACT ON TRAVEL:
63637 This project consists of HMA resurfacing, pavement patching, curb and gutter removal and replacement located along State Parkway from Roselle Road to Plum Grove Road in the village of Schaumburg. |
|
US 12/45 @ intersection with Perry Street Roadway widening, resurfacing, traffic signals, landscaping. |
Des Plaines 4/2012 7/2012 $1.027 |
IMPACT ON TRAVEL:
63616 Project consists of roadway widening, resurfacing, traffic signal installation, roadway lighting, landscaping and all other incidental items to complete the work on FAP Route 330 (U.S. Routes 12/45) at the intersection with Perry Street in the city of Des Plaines. |
|
US 20 (Lake St.) I-290 and Walnut St. Interchange reconstruction, traffic signals & lighting. |
Elmhurst 3/2011 7/2012 $6.156 |
IMPACT ON TRAVEL:
62093 Interchange reconstruction, traffic signals, lighting and other work on US 20 (Lake Street) at York Road, I-290 and Walnut Street to York Road in Elmhurst. |
|
US 41 (Lincoln Avemue) Resurfacing |
Lincolnwood and Skokie 8/2011 10/2011 $2.782 |
IMPACT ON TRAVEL:
60M06 2.65 miles of resurfacing on US Route 41 - Lincoln Avenue from Niles Center Road to Devon Avenue in Lincolnwood and Skokie. |
|
Various Installation of bus shelters, parkway and sidewalk installation |
Oak Park 8/2011 6/2012 $0.12 |
IMPACT ON TRAVEL:
63538 Project consists of curb and gutter removal and replacement, parkway and sidewalk removal and replacement and the installation of new concrete bus shelter pads at 11 locations along with the electrical wiring to provide power to the shelter structures, installation of a bus shelter at one of the locations and all other incidental items to complete the work at various routes in the Village of Oak Park. |
|
Various routes Intermittent pavement resurfacing |
Northern Cook County 9/2011 10/2011 $2.867 |
IMPACT ON TRAVEL:
60P02 Intermittent pavement resurfacing on various routes in northern Cook County. |
|
Various routes Bridge painting |
Morton Grove, Libertyville, Northfield, Prospect Heights 4/2012 9/2012 $478 |
IMPACT ON TRAVEL:
60P58 Bridge painting of various structures on various routes in Morton Grove, Libertyville, Northfield and Prospect Heights. OTHER COMMENTS: Also in Lake County |
|
West Lake Avenue & Greenwood Road Resurfacing |
Glenview 8/2011 12/2011 $0.283 |
IMPACT ON TRAVEL:
60P10 Resurfacing of 0.82 mile of West Lake Avenue from Pfingsten Road to Greenwood Road and Greenwood Road from West Lake Avenue to Bellwood Lane in Glenview. |
|
West side of Douglas Avenue Concrete multi-use path |
Arlington Heights 5/2012 7/2012 $0.89 |
IMPACT ON TRAVEL:
63230 Project consists of the installation of a concrete multi-use path and all other incidental items to complete the work along the west side of Douglas Avenue between Northwest Highway/Kensington Road and Miner Street in the Village of Arlington Heights. |
|
Wolf Road Modernization of traffic signals, detectable warnings. |
Northlake 7/2011 5/2012 $0.226 |
IMPACT ON TRAVEL:
63558 Modernization of the existing traffic signal installation including temporary traffic signals, new mast arm assemblies and poles, traffic signal posts, countdown traffic signals, pedestrian pushbuttons, traffic signal controller and cabinet with uninterruptible power supply, emergency vehicle pre-emption, concrete sidewalk removal and replacement, detectable warnings and all other incidental items to complete the work at the intersection of Wolf Road and Fullerton Avenue in Northlake. |
|
Wolf road Bridge fabrication |
Prospect Heights, Wheeling 1/2012 8/2012 $0.139 |
IMPACT ON TRAVEL:
60R35 Beam and bearing fabrication for the structure carrying Wolf Road over Palatine Road in Prospect Heights and Wheeling. |