Loading
District 1
Counties
include: Cook, DuPage, Kane, Lake, McHenry, Will
CURRENT CONSTRUCTION PROJECTS
Chicago and Suburb Construction
Details - Chicago area construction projects for
McHenry, Lake, Kane, Dupage, Will, and Cook counties.
Illinois 53 (Rohlwing Road)
Widening and Reconstruction Project
- Illinois Route 53 (Rohlwing Road) from Army Trail Road
on the southern limits to the Elgin O’ Hare Expressway
on the northern limits.
Illinois 56 (Butterfield Road)
Reconstruction and Widening Project - Illinois Route 56 (Butterfield Road)
West of Illinois Route 59 to Naperville Road
Illinois 64 Improvement
Project
- Illinois Route 64 from 7th Avenue to Illinois
59.
Interstate 55 @ Arsenal
Road -
Relocate and reconfigure the Interstate 55 interchange
at Arsenal Road in Will County.
Interstate 55 at Central
Avenue -
Rehabilitation and reconstruct the Interstate 55 at
Central Avenue Interchange.
Interstate 57 /
Interstate 294 Interchange Project - Construct a
full interchange for the Interstate 57 overpass at
Interstate 294
U.S. Route 20 at McLean Blvd.
-
Total reconstruction of the US 20 (Lake Street) over
McLean Boulevard interchange
U.S. Route 30 at Illinois
Route 31 Widening and Reconstruction -
NEW
- Widening and reconstruction of US Route 30 at Illinois
Route 31
U.S. Route 30
Reconstruction Project
- Williams Street in New Lenox to Harlem Avenue in
Frankfort.
Western Algonquin Bypass - Illinois Route 31 North Junction to Illinois 31 South
Junction
Willow Road
Reconstruction -
NEW
- Willow Road Reconstruction from
IL 43 to Interstate 94
O'HARE INTERNATIONAL AIRPORT AREA PROJECTS
Illinois 19 (Irving Park Road) at
York Road -
NEW
- Intersection Reconstruction & Bridge
Construction
PROJECT STUDIES
Circle Interchange - The Circle Interchange Project
is a two-year planning and design project which will
identify the scope of improvements and the potential
cost and construction schedule. The project is located
in the heart of downtown Chicago, adjacent to the west
end of the central business district.
47th Street at East Avenue Study -
NEW
- Phase 1 study for the intersection improvements at
47th Street and East Avenue in La Grange, IL.
I-55
Managed Lane Project - preliminary engineering and
environmental (Phase I) Study for potential improvements
to Interstate 55 corridor from I-355 to I-90/I-94.
95th Street and Stony Island Avenue - preliminary
engineering and environmental (Phase I) Study for
potential improvements to the 95th Street at Stony
Island Avenue intersection.
US Route
30 - Phase I study
from IL 47 to IL 31 in Kane and Kendall Counties
Barrington Road at I-90 Interchange - Phase 1 Study
of potential improvements to the Barrington Road
interchange on the Jane Addams Memorial Tollway (I-90).
Illinois 83/Illinois 137 Study - Phase I Study from IL 83/Grande Avenue to IL 137/Buckley Road in Lake County
Wood Street / Ashland Avenue
- South of US Route 6 (159th Street) to 138th Street in Cook County
U.S. Route 14 Grade
Separation at CN/EJ&E Railway - Preliminary
Engineering Study for a potential grade separation of
U.S. Route 14 (Northwest Highway) at the CN/EJ&E Railway
at-grade crossing.
Interstate 55
Bus-On-Shoulder Demonstration - Two year
demonstration of transit bus operations on the
Interstate 55 (Stevenson Expressway) left shoulder.
Illinois Route 31
Phase I Study - From IL Route 176 to IL Route 120 in
McHenry County
Central Avenue Corridor
Project Study
Illinois 131 (Green Bay Road) Project Study
Interstate 55 at Weber Road
Study - Interstate 55 (I-55) interchange at
Weber Road.
Illiana Corridor
- Phase I (Tiered Process) Study which includes a study
of funding, financing and implementation options,
including the feasibility of Public-Private Partnerships
(P3). The study area generally was located between I-65
on the east, I-55 on the west, U.S. 30 on the north, and
north Kankakee County on the south.
Interstate 80 Phase 1
Study - Ridge Road to US Route 30
Interstate 294 /
Interstate 57 - I-294 / I-57 Interchange Environmental
Assessment
Interstate
290(Eisenhower) Preliminary Engineering Study
South
Suburban Airport News - Information about the proposed
South Suburban Airport
Elgin O’Hare – West Bypass
US 34 and the CN Railroad Crossing in Aurora
Illinois 60 / 83 - From IL Route 176 to the
intersection of IL Route 60 and IL Route 83 in Lake
County
Interstate 55 at Airport/Lockport Road
Interstate Route 55 at Lorenzo/IL 129 in Will County
Illinois 47 - Reed Street to US-14
Willow Road Study - Illinois 43 to Edens Expressway
Illinois 173 - Phase I Study process and schedule.
SECTION 4(F) DOCUMENTS
SRA REPORTS
District One SRA Resources
District 2
Counties
include: Boone, Carroll, Henry, JoDaviess, Lee, Ogle, Rock
Island, Stephenson, Whiteside, Winnebago
U.S. 52/IL 64 Over the Mississippi River Study
Interstate 39/US 20 Improvement
Project
U.S. 20 Freeport to Galena
Project
U.S. 20 Galena
Bypass - Phase II Engineering
U.S. 20 (Rockford
Bypass): IL 2 to I-39
U.S. 30 Fulton to Rock Falls -
Located in Whiteside County
Illinois 2 Study - Auburn
Street to Riverside Blvd - Rockford, Illinois
Illinois 40 - IL 40 (1st Avenue) Rock River bridge replacement study between Sterling and Rock Falls.
District 3
Counties
include: Bureau, DeKalb, Ford, Grundy, Iroquois, Kankakee,
Kendall, LaSalle, Livingston
Illinois 47 Improvement
- Kennedy Road in Yorkville to Cross Street in Sugar Grove
PROJECT STUDIES
Illinois 47 Study
- Kendall County
- From Illinois Route 71 on the north to Caton Farm Road
on the south
Illinois 71 Study -
Kendall County, 5.41 miles of reconstruction & adding lanes.
Interstate 57
Interchange at Illinois 17 -
NEW - Preliminary
engineering study to reconstruct interchange 312 at
Kankakee
Prairie
Parkway Corridor Protection Study - Grundy, Kendall and
Kane Counties
US 34 Sandwich to Plano -
preliminary engineering study of possible improvements to
the US 34 Corridor
District 4
Counties
include: Fulton, Henderson, Knox, McDonough, Marshall,
Mercer, Peoria, Putnam, Stark, Tazewell, Warren, Woodford
Peoria Area Traffic Cameras
Eastern Bypass -
Proposed Study of new highway connecting I-74 with IL-6
Illinois 29 - IL Route 29 Study
in Peoria, Marshall, Putnam, and Bureau Counties.
Interstate 74 /
Interstate 155 - NEW
- Improvements to a section of I-74 and I-155 near
Morton in Tazewell County
Peoria to Macomb
Study
U.S. 67 Corridor
US 34 Project
District 5
Counties
include: Champaign, DeWitt, Douglas, Edgar, McLean, Piatt,
Vermilion
U.S. 136 Danville Main Street
Reconstruction Project
District 6
Counties
include: Adams, Brown, Cass, Christian, Hancock, Logan,
Macoupin, Mason, Menard, Montgomery, Morgan, Pike, Sangamon,
Schuyler, Scott
Bus I-55/South Sixth Street Expansion Study - From
Stanford Avenue to Interstate 72/6th Street Interchange
I-55
Reconstruction - Design study and environment assessment
to improve the interstate through Springfield and Sangamon
County
Illinois 104 - IL Route 104 over Illinois River Study
Illinois River Bridge at Florence – River crossing
alternates feasibility study and context sensitive solutions
U.S. 67 Corridor
U.S. 136 Realignment
Study - NEW -
US Route 136 from the Mississippi River Bridge to Main
Street in Hamilton, IL.
District 7
Counties
include: Clark, Clay, Coles, Crawford, Cumberland, Edwards,
Effingham, Fayette, Jasper, Lawrence, Macon, Moultrie,
Richland, Shelby, Wabash, Wayne
U.S. 50
Expressway Project - 27-mile project will look at US
Route 50 from 2.5 miles west of Illinois Route 130 (near
Olney) to 3.5 miles east of Illinois Route 1 (near
Lawrenceville)
District 8
Counties
include: Bond, Calhoun, Clinton, Greene, Jersey, Madison,
Marion, Monroe, Randolph, St. Clair, Washington
Alton-Godfrey
Transportation Study - New
Interstate 55 Corridor Work
Zones
Interstate 70 - Access
Highland Project
Interstate 270 Chain of Rocks
Canal Bridge Project - New
Illinois 3 - Improvement project in Waterloo
Illinois 159 - Study in
Madison and St. Clair Counties.
Illinois 255 / Alton Bypass
- Extension of IL 255 from Interstate 270 near Edwardsville
to US 67 in Godfrey.
U.S. 67 Corridor
New Mississippi
River Bridge Project - Connecting Missouri & Illinois to
downtown St. Louis
Gateway Connector Study
- Madison, St. Clair, and Monroe counties.
District 9
Counties
include: Alexander, Franklin, Gallatin, Hamilton, Hardin,
Jackson, Jefferson, Johnson, Massac, Perry, Pope, Pulaski,
Saline, Union, White, Williamson
I-66 - Alexander, Johnson,
Massac, Pulaski, and Union Counties
Interstate 57 / Illinois 13 and Morgan Ave
Project - Proposed Traffic and Roadway Network
Improvements
Interstate 57 - Proposed Traffic and Roadway Network Improvements
Illinois 13 - Proposed Traffic and Roadway Network Improvements
Illinois 13 - 127 - Proposed Traffic and Roadway Network Improvements
U.S. 45 - Proposed Traffic
and Roadway Network Improvements
Current Road Construction
Fiber - Optic Network Report
Illinois State Rail Plan
Illinois State Transportation Plan
Expressway Lane Closures
- Ramp and lane closures for Illinois expressway