SPRINGFIELD, IL -- The Illinois Department of Transportation has
selected consultants for 25 projects across the state. The
consultants were selected by special committee on December 11.
The projects by county, and the consulting firm selected, are:
- McHENRY, plans for the reconstruction of US 14 from west of
Lake Shore Dr. to northwest of Lucas Road. Teng & Associates,
Inc., Chicago.
- McHENRY, plans for the reconstruction of US 14 from northwest
of Lucas Road to north of IL 176, and widening from north of IL
176 to Crystal Lake Ave. H.W. Lochner, Inc., Chicago.
- COOK, plans for the replacement of the Chicago Heights Road
bridge over Butterfield Creek. Primera Engineers, Ltd., Chicago.
- WILL, location/design report for the improvement of I-57 at
Stuenkel Road. Clark Dietz, Inc., Chicago.
- DuPAGE, feasibility study for modifying the interchange of
York Road at Roosevelt Road. Louis Berger & Assoc., Inc.,
Chicago.
- DISTRICT 1, traffic signal coordination and timing of various
systems on a work order basis. Hampton, Lenzini and Renwick,
Inc., Elgin.
- DISTRICT 1, land surveys for various roadway projects on a
work order basis. Marchese and Sons, Inc., Roselle.
- DISTRICT 1, traffic data collection for traffic studies on a
work order basis. Regina Webster and Assoc., Inc., Chicago.
- DISTRICT 1, bituminous concrete mix designs on a work order
basis. JFG Technical Center, Inc., Thornton.
- WHITESIDE, corridor study for a multi-lane highway between
Fulton and I-88 west of Rock Falls. HDR Engineering, Inc.,
Chicago.
- DISTRICT 2, construction inspection on various projects in the
northern half of the district. Cemcon Ltd., Winfield.
- DISTRICT 2, construction inspection on various projects in the
southern half of the district. STV Inc., Chicago.
- DISTRICT 2, Phase I and/or Phase II work for various projects
on a work order basis. WHKS & Co., East Dubuque.
- HANCOCK/McDONOUGH, plans for a new four-lane expressway from 1
mile west of the Hancock/McDonough County line to 1.7 miles east
of IL 61, including dual structures over the LaMoine River.
Horner & Shifrin, Inc., Fairview Heights.
- DISTRICT 4, construction inspection on various projects. Rapps
Engineering & Applied Science, Springfield.
- DISTRICT 6, Phase I and/or Phase II work for various projects
on a work order basis. Homer L. Chastain & Assoc., LLP, Decatur.
- DISTRICT 6, Phase I and/or Phase II work for various projects
on a work order basis. Poepping, Stone, Bach & Assoc., Inc.,
Quincy.
- DISTRICT 8, subsurface utility engineering for various
projects on a work order basis. So-Deep, Inc., Belleville.
- DISTRICT 8, Phase I and/or Phase II work for various projects
on a work order basis. Klingner & Assoc., PC, Quincy.
- MADISON, construction inspection for the rehabilitation of the
McKinley Bridge in Venice. Crawford, Murphy, & Tilly, Inc., East
Alton.
- DISTRICT 8, land surveys for various roadway projects on a
work order basis. LTR Land Surveying, Inc., Waterloo.
- MADISON, construction inspection for grading and paving of
3.17 miles of IL 255 from IL 140 to Fosterburg Road. SCI
Engineering, Inc., Fairview Heights.
- DISTRICT 8, construction inspection on various projects.
Hoelscher Engineering, PC, Fairview Heights.
- STATEWIDE, waste assessment investigation studies and designs
at various locations statewide on a work order basis. Weston
Solutions, Inc., Chicago.
- DISTRICT 1, field collection of traffic data in the district.
Avila Computer Services, Inc., Chicago.
###
|