1. McHENRY, plans for the reconstruction of US 14 from
west of Lake Shore Dr. to northwest of Lucas Road.
2. McHENRY, plans for the reconstruction of US 14 from northwest
of Lucas Road to north of IL 176, and widening from north of IL 176
to Crystal Lake Ave.
3. COOK, plans for the replacement of the Chicago Heights Road
bridge over Butterfield Creek.
4. WILL, location/design report for the improvement of I-57 at
Stuenkel Road.
5. DuPAGE, feasibility study for modifying the interchange of York
Road at Roosevelt Road.
6. DISTRICT 1, traffic signal coordination and timing of various
systems on a work order basis.
7. DISTRICT 1, land surveys for various roadway projects on a work
order basis.
8. DISTRICT 1, traffic data collection for traffic studies on a
work order basis.
9. DISTRICT 1, bituminous concrete mix designs on a work order
basis.
10. WHITESIDE, corridor study for a multi-lane highway between
Fulton and I-88 west of Rock Falls.
11. DISTRICT 2, construction inspection on various projects in the
northern half of the district.
12. DISTRICT 2, construction inspection on various projects in the
southern half of the district.
13. DISTRICT 2, Phase I and/or Phase II work for various projects
on a work order basis.
14. HANCOCK/McDONOUGH, plans for a new four-lane expressway from 1
mile west of the Hancock/McDonough County line to 1.7 miles east of
IL 61, including dual structures over the LaMoine River.
15. DISTRICT 4, construction inspection on various projects.
16. DISTRICT 6, Phase I and/or Phase II work for various projects
on a work order basis.
17. DISTRICT 6, Phase I and/or Phase II work for various projects
on a work order basis.
18. DISTRICT 8, subsurface utility engineering for various
projects on a work order basis.
19. DISTRICT 8, Phase I and/or Phase II work for various projects
on a work order basis.
20. MADISON, construction inspection for the rehabilitation of the
McKinley Bridge in Venice.
21. DISTRICT 8, land surveys for various roadway projects on a
work order basis.
22. MADISON, construction inspection for grading and paving of
3.17 miles of IL 255 from IL 140 to Fosterburg Road.
23. DISTRICT 8, construction inspection on various projects.
24. STATEWIDE, waste assessment investigation studies and designs
at various locations statewide on a work order basis.
25. DISTRICT 1, field collection of traffic data in the district.
26. STATEWIDE, Department of Natural Resources, construction
inspection at reclamation project sites north of I-70.
27. STATEWIDE, Department of Natural Resources, construction
inspection at reclamation project sites south of I-70.