SPRINGFIELD, IL -- The Illinois Department of Transportation opened bids
on August 2, 2002 for various road and bridge
improvement projects located throughout the state. Also included were
18 aeronautics projects, one land reclamation project and one water resource
project.
Following is a list of the projects by county, and the apparent low
bidder:
1. Crawford County, Trimble Road, District 7, 5.11 miles of patching,
milling, bituminous concrete resurfacing, bituminous shoulders and aggregate
wedge shoulders on Trimble Road (FAS Route 1696) from IL 1 at Trimble southwest
to IL 33 in Robinson. 45 Working Days. Ambraw Asphalt Materials, Inc.,
Lawrenceville, $738,418.
2. Effingham County, IL 32/33, District 7, 0.79 mile of a temporary detour on
the median side of the eastbound lanes of I-57/70 through the interchange with
IL 32/33 (Keller Drive) at Effingham. Completion Date October 31, 2002. Howell
Asphalt Co. & Howell Paving, Inc., Mattoon, $813,587.
3. Hancock County, IL 94, District 6, 0.60 mile of patching, milling,
bituminous concrete resurfacing and aggregate wedge shoulders on IL 94 just
north of Carthage. 15 Working Days. W.L. Miller Co., Hamilton, $97,005.
4. LaSalle-Grundy Counties, US 6, District 3, 9.9 miles of milling and
bituminous concrete resurfacing on US 6 from Marseilles to Interstate 80 at
Walker's Corner. Completion Date November 01, 2002. Advanced Asphalt Co.,
Princeton, $757,206.
5. Menard County, IL 97/IL 123, District 6, 7.67 miles of patching, milling,
leveling binder, bituminous concrete resurfacing, bituminous shoulder and
aggregate wedge shoulders on IL 97/123 from the Sangamon County line north to
North Lake Shore Drive south of Petersburg. Completion Date December 01, 2002.
Truman L. Flatt & Sons Co., Inc., Springfield, $1,248,553.
6. St. Clair County, E. Hwy 50, District 8, 0.39 mile of milling, bituminous
concrete resurfacing (skidproofing), pavement marking, traffic signal work
detector loop replacement on East Highway 50 at Lincoln Street in O'Fallon. 20
Working Days. Mounds Construction Co., Inc., Collinsville, $128,450.
7. Will County, I-80 Frontage Rd., District 1, 0.19 mile of milling and
bituminous concrete surface on I-80 frontage road located near Larkin Avenue in
Joliet. 15 Working Days. Gallagher Asphalt Corp., Thornton, $34,500.
8. Winnebago County, Springfield Ave./Riverside Blvd., District 2, 2.12 miles
of bituminous concrete widening and resurfacing on Springfield Avenue/Riverside
Boulevard in Rockford from Auburn Street to Owen Central Road. 50 Working Days.
Rockford Blacktop Construction Co., Loves Park, $734,750.
9. Bond County, I-70, District 8, The straightening of one interior beam in
the north span of the 4 span structure carrying Mulberry Grove Road (FAS Route
782) over I-70 at Mulberry Grove. Completion Date November 01, 2002. Plocher
Construction Co., Inc., Highland, $16,300.
10. Cook County, US 12/20/45 (LaGrange Rd.), District 1, Joint repair and
deck patching on 2 bridges carrying US 12/20/45 (LaGrange Road) over Des Plains
River in Hodgkins and over S & S Canal, I & M Canal and ICG Railroad, in Willow
Springs. Completion Date June 30, 2003. Lorig Construction Co., Des Plaines,
$795,465.
11. Cook County, Edens Expressway, District 1, Parapet repair and pedestrian
rail installation on the bridges carrying I-94 (Eden's Expressway) under Church
Street in Skokie and Lincoln Avenue in Morton Grove. 35 Working Days. Lorig
Construction Co., Des Plaines, $561,472
12. Cumberland County, I-70, District 5, Removal and replacement of the
bridge decks on the structures carrying I-70 over Muddy Creek, Cottonwood Creek
and Range Creek from west of Jewett to east of Greenup. Completion Date December
01, 2003 Plus 10 Working Days. Halverson Construction Co., Inc., Springfield,
$5,117,594.
13. Cook County, US 6 (159th Street), District 1, Traffic signal
modernization on US 6 (159th Street) from Crawford Avenue to Richmond Avenue in
Markham. 60 Working Days. Hawk Enterprises, Inc. of Indiana, Crown Point, IN,
$495,178.
14. Cook County, IL 72, District 1, Traffic signal modernization on IL 72
from East River Road/Dee Road to Canfield Avenue in Park Ridge. 35 Working Days.
H & H Electric Co., Franklin Park, $127,793.
15. Kankakee County, IL 50, District 3, Modernization of the traffic signals
at the intersections of IL 50 with North Street and Broadway Street in Bradley.
45 Working Days. Van-Mack Electric, Joliet, $259,418.
16. Will County, IL 53, District 1, Traffic signal installation on IL 53 at
Caton Farm Road at Crest Hill 35 Working Days. Hawk Enterprises, Inc. of
Indiana, Crown Point, IN, $79,411.
17. Bureau County, Old Dad Joe Trail, District 2, Installation of a fire
protection system for Red Covered Bridge over Bureau Creek just north of
Princeton. 30 Working Days. NO BIDS RECEIVED.
18. Bureau-LaSalle Counties, I-80 Frontage Roads, District 2, Resurfacing of
two frontage roads along the north side of I-80. One begins at IL 89 and extends
easterly for 1.1 miles. The second one begins at Plank Road and extends west for
1.38 miles near Ladd. 15 Working Days. Ladd Construction Co., Ladd, $120,073.
19. DuPage County, Various Routes, District 1, Removal and replacement of
damaged raised reflective pavement markers and castings at various locations.
Completion Date October 31, 2003. Superior Road Striping, Inc., Bensenville,
$242,168.
20. Effingham County, I-57, District 7, Continuously reinforced PCC patching
on I-57 northeast of Effingham from approximately 1 mile north of I-70 north 4
miles to the Shelby/Effingham county line. 20 Working Days. Kinney Contractors,
Inc., Raymond, $59,690.
21. Madison County, IL 159, District 8, Culvert repair on IL 159
approximately 2.3 miles north of IL 143 at Edwardsville. Completion Date
September 30, 2002. Thiems Construction Co., Inc., Edwardsville, $32,420.
22. Madison County, IL 3 & IL 203, District 8, In Granite City the
resurfacing and skidproofing of IL 3 at the intersection with Old Chain of Rocks
Road and IL 203 at the intersection with Johnson Road/Fehling Road. Completion
Date November 01, 2002. Mounds Construction Co., Inc., Collinsville, $166,337.
23. Madison-St. Clair Counties, I-255, District 8, inspect and repair seven
submersible pumps at four pump station locations along I-255 between Horseshoe
Lake Road and Collinsville Road west of Collinsville. 50 Working Days. Missouri
Machinery & Engineering Co., St. Louis, MO, $194,727.
24. Rock Island-Whiteside Counties, I-80 & I-88, District 2, 4.6 miles of
full depth concrete patching on Interstate 80 from the Mississippi River to the
Rock River and on I-88 from the Rock Island/Whiteside County line easterly for
2.8 miles. 15 Working Days. AEH Construction, Inc., Galesburg, $113,582.
25. St. Clair County, IL 3, District 8, 0.36 mile of patching, milling,
bituminous concrete resurfacing (skidproofing) and detector loop replacement at
IL 3 and Monsanto Avenue in Sauget and at IL 3 and IL 157 in Cahokia. 20 Working
Days. Mounds Construction Co., Inc., Collinsville, $166,880.
26. St. Clair County, IL 15, District 8, On IL 15 east of the interchange
with I-255 at Centreville the work will consist of formed concrete repair on the
interior median and removing and replacing 55 foot of bituminous shoulder. 15
Working Days. Keeley & Sons, Inc., East St. Louis, $21,858.
27. St. Clair-Washington-Randolph Counties, Various Routes, District 8, 28.3
miles of crack and joint seal on I-64, Old US 50, IL 15, Shiloh Road, IL 157 and
IL 203 in St. Clair County; I-64 in Washington County and IL 153 in Randolph
County. Completion Date November 17, 2002. Kenney Contractors, Inc., Raymond,
$199,629.
28. Union County, I-57, District 9, vertical adjustment of the existing
guardrail on I-57 beginning approximately 1.25 miles south of Dongola at the
Pulaski County Line and extending north 6.36 miles. 25 Working Days. Midwest
Fence Corp., Chicago, $75,323.
29. Various Counties, Various Routes, Districts 1, 2, 5, 8, repairing or
replacing damaged or deteriorated overhead sign structure components and
supports along various routes located throughout Districts 1 2, 5 and 8.
Completion Date July 31, 2003. Western Remac, Inc., Woodridge, $613,406.
30. Will County, I-55, District 1, Installation of steelplate beam guardrail
along median shoulders at the I-55/I-80 interchange at Channanhon. 10 Working
Days. G.F. Structures Corp., Chicago, $54,340.
31. Winnebago County, US 20 Bypass, District 2, 0.35 km of crossover
construction for bridge replacement at US 20 Bypass over Cunningham Road, one
mile east of Meridan and the CC & P Railroad southeast of Rockford. Completion
Date November 15, 2002. Rockford Blacktop Construction Co., Loves, Park,
$292,661.
32. Kankakee County, Essex Road, District 3, 4.03 miles of milling and
resurfacing of Essex Rd. from IL 17 north to Essex. 15 Working Days. Kankakee
Valley Construction, Kankakee, $391,723.
33. Kankakee County, St Anne Blacktop, District 3, 1.47 miles of bituminous
resurfacing on St. Anne Blacktop from 2500 East Road to 4000 East Road, 3.5
miles west of St. Anne. 15 Working Days. Kankakee Valley Construction, Kankakee,
$90,694.
34. Madison County, US 40, District 8, Widening and resurfacing at the
intersection of US 40 and Main Street in Troy for the construction of a right
turn lane at the north approach (Main Street) to the intersection. 50 Working
Days. C.D. Peters Construction Co., Granite City, $262,692.
35. McLean County, US 150 & IL 9, District 3, 0.17 mile of milling and
bituminous concrete surface course on US 150/IL 9 from Martin Luther King Drive
to Caroline Street in Bloomington. 20 Working Days. Rowe Construction Co.,
Bloomington, $140,867.
36. Monroe County, Maeystown Road, District 8, 4,600 ft of new bituminous
pavement and reconstruction of 2,000 ft of existing roadway from the
intersection of Maeystown and Baum Road northerly along the northwest limits of
Maeystown reconnecting with Mayestown Road. 160 Working Days. Baxmeyer
Construction Co., Waterloo, $1,168,922.
37. Montgomery County, Nokomis Blacktop, District 6, 22 ft width bituminous
mixture complete and aggregate wedge shoulders on the Nokomis blacktop beginning
approximately 7 miles west of Nokomis and extending 2.0 miles east. 15 Working
Days. Macoupin County Contracting, Inc., Staunton, $222,524.
38. St. Clair County, IL 177/IL 158, District 8, Patching, milling, leveling
binder and bituminous concrete resurfacing, bituminous shoulders, aggregate
wedge shoulders and repairs on three structures on IL 177/158 from Mine Road in
Mascoutah northwest 4.55 miles. Completion Date June 30, 2003. Mounds
Construction Co., Inc., Collinsville, $1,123,389.
39. St. Clair County, IL 111, District 8, 1.27 miles of patching, milling and
bituminous concrete resurfacing on IL 111 from Bunkum Road to the CSX Railroad
Bridge in Washington Park. Completion Date October 31, 2002. Mounds Construction
Co., Inc., Collinsville, $277,547.
40. Warren County, East Broadway Ave, District 4, 0.908 miles bituminous
surfacing, milling, striping, concrete sidewalk and other collateral work on
East Broadway from South Main St. to south 11th St. in Monmouth. Completion Date
November 15, 2002. Gunther Construction Co., Galesburg, $454,962.
41. Williamson County, IL 166, District 9, East of Marion on IL 166 from IL
13 extending south 4.62 miles the improvement will consist of patching, milling,
bituminous concrete resurfacing and th aggregate wedge shoulders. 30 Working
Days. Southern Illinois Asphalt Co., Inc., Marion, $469,175.
42. Champaign County, I-57, District 5, Replacement of the deck on three dual
structures on I-57 located near Pesotum over the I.C.C. Railroad and T.R. 132;
near Tolono over the Norfolk Southern Railroad; and near Champaign over Phinney
Branch. 160 Working Days. O'Neil Bros., Urbana, $4,893,342.
43. Cook County, 135th Street, District 1, Removal of the existing structure
and replacement with a single span, precast prestressed concrete I-beam bridge
carrying 135th Street over Tinley Creek in Bremen. Completion Date September 30,
2003 Plus 10 Working Days. Herlihy Mid-Continent Co., Romeoville, $1,287,924.
44. Fayette County, St Elmo Road, District 7, Construction of a single span,
precast, prestressed concrete deck beam bridge carrying St. Elmo Road over
tributary to Sugar Creek at the north city limits of St. Elmo. 45 Working Days.
Depew and Owen Builders, Inc., Centralia, $243,328.
45. Gallatin County, Saline Mine Road, District 9, Construction of a single
span, precast, prestressed concrete deck beam bridge carrying CH 8, Saline Mine
Road, over tributary to Saline River, 2.5 miles east of IL 1 and 5.5 miles south
of Shawneetown. 35 Working Days. Dees, Inc., West Frankfort, $192,226.
46. Gallatin County, Washington Road, District 9, Construction of a three
span, precast, prestressed concrete deck beam bridge, carrying Washington Road
over Bear Creek, 1 mile west of Omaha. 40 Working Days. Perry County
Construction Co., Herrin, $298,369.
47. Madison County, Pocahontas Road, District 8, removal and replacement of
superstructures at two locations on Pocahontas Road. Construction on the first
structure, located 1.5 miles NE of Marine over Sugar Fork Creek, consists of new
abutments and new precast prestressed concrete deck beams, widening of existing
piers and approaches. Construction on the second structure, located 2.5 miles NE
of Marine over Sand Creek, consists of new steel wide flange superstructure with
concrete deck, widening of existing substructure and approaches. 130 Working
Days. RCS Construction, Inc., Wood River, $987,279.
48. Peoria County, US 24, District 4, Geometric improvements at I-474/US 24
interchange north of Bartonville, includes traffic signal installation. 35
Working Days. P.J. Hoerr, Inc., Peoria, $283,724.
49. Champaign County, I-74, District 5, Improvements consist of resurfacing
four of the eight ramps at the interchange of I-74 and I-57, along with
resurfacing I-74 under Lincoln Avenue near Champaign. 15 Working Days.
University Construction, Urbana, $226,375.
50. Cook County, Unmarked Route, District 1, Improvement consists of PCC
sidewalk removal and replacement on Edwards Avenue, 46th Avenue, Gail Avenue and
Whitehall Avenue in Northlake. 30 Working Days. Triggi Construction, Inc., West
Chicago, $226,136.
51. WITHDRAWN
52. Jersey-Madison Counties, Various Routes, District 8, Milling and
bituminous concrete resurfacing at the following locations: (1) 1.0 mile on US
67 near New Delhi in Jersey County from Piasa Creek southeast to North Ingham
Lane (2) 0.21 miles at the intersection of IL 3 and IL 143 at Wood River and (3)
0.39 mile on IL 140 in Bethalto. Completion Date November 01, 2002. Charles E.
Mahoney Co., Belleville, $233,795.
53. WITHDRAWN
54. Grundy-LaSalle Counties, US 6 & IL 47, District 3, 19.18 miles of crack
and route sealing on US 6 & IL 47 in Grundy and LaSalle counties. 35 Working
Days. Kenneth R. Hartman, Inc., Kankakee, $106,769.
55. Iroquois-Kankakee Counties, Various Routes, District 3, Crack and joint
sealing on US 24 from IL 49 easterly to Watseka; on IL 1 from Milford southerly
9.0 miles to the Vermilion/Iroquois county line; and on IL 1/17 northerly 5.0
miles to Momence (IL 1/114 junction). 45 Working Days. Freehill Asphalt, Inc.,
Watseka, $126,006.
56. Various Counties, Various Routes, District 3, Planting trees and
wildflower seeding at various locations. Completion Date June 30, 2003. Four
Seasons Garden Center, Inc., Mattoon, $201,759.
57. Knox-Mercer-Henderson Counties, Various Routes, District 4, 25.95 miles
of routing and sealing on various routes in Knox, Mercer and Henderson counties.
25 Working Days. Huff Sealing Corp., Albion, $177,125.
58. Cass County, Wall St & 15th St, District 6, 0.82 mile of bituminous
superpave resurfacing on Wall Street and 15th Street) from IL 125 northwesterly
to 15th Street and then southwesterly to Edwards Street in Beardstown. 20
Working Days. Illinois Valley Paving Co., Springfield, $163,980.
59. Champaign County, Thomasboro Road, District 5, 5.68 miles of resurfacing
Thomasboro Rd. beginning at County Highway 1 (Dewey-Fisher Road) easterly to
Thomasboro and the Illinois Central Railroad. 25 Working Days. University
Construction, Urbana, $639,514.
60. WITHDRAWN
61. WITHDRAWN
62. Cook County, Plum Grove Road, District 1, roadway reconstruction and
resurfacing on Plum Grove Road from Aldridge Avenue north to Palatine Road in
Palatine. Work includes aggregate shoulders or concrete curb and gutter,
concrete sidewalk, driveway, landscaping and traffic signal modernization.
Completion Date September 19, 2003 Plus 10 Working Days. Glenbrook Excavating
and Concrete, Inc., Prairie View, $4,237,163.
63. Gallatin County, Southtown-New Haven Road, District 9, 5.46 miles of
resurfacing Southtown-New Haven Rd. with bituminous concrete binder and surface
courses & aggregate shoulders from Galt Road in Shawneetown north. 35 Working
Days. E.T. Simonds Construction Co., Carbondale, $454,329.
64. Kankakee County, IL 50, District 3, 0.67 km of bituminous concrete
widening and resurfacing on IL 50 from Brookmont Boulevard in Kankakee to
Liberty Street in Bradley. Includes removal and replacement of the structure
carrying IL 50 over Soldier Creek. Completion Date August 15, 2003. Kankakee
Valley Construction, Kankakee, $2,462,634.
65. LaSalle County, IL 23, District 3, 9.6 miles of milling, bituminous
concrete resurfacing, bituminous shoulder reconstruction, bridge repairs and
turn lanes on IL 23 from Ottawa to Richards Road in Streator. Completion Date
September 01, 2003. Advanced Asphalt Co., Princeton, $2,456,073.
66. Lee County, IL 26, District 2, Reconstruction of the intersection of IL
26/US 52 at Lowell Park in Dixon. 45 Working Days. Northwest Illinois
Construction Co., Rock Falls, $784,871.
67. Macoupin County, Shipman Blacktop, District 6, widening, milling,
bituminous concrete resurfacing, bituminous shoulders, aggregate shoulders,
storm sewer, box culvert extensions and sidewalk along the Shipman Blacktop from
IL 108 in Carlinville southwest 1.77 miles. Completion Date July 31, 2003.
Macoupin County Contracting, Inc., Staunton, $1,324,339.
68. Montgomery County, Burg Road, District 6, 5.6 miles of bituminous
resurfacing, aggregate and bituminous shoulders on Burg Road from IL 185 to
north to Fillmore. 80 Working Days. Macoupin County Contracting, Inc., Staunton,
$1,426,312.
69. WITHDRAWN
70. Saline County, College Road, District 9, 4.47 miles resurfacing with
bituminous concrete binder and surface courses including aggregate shoulders on
College Road from Eldorado south to IL 13. 30 Working Days. Southern Illinois
Asphalt Co., Inc., Marion, $465,473.
71. Saline County, Raleigh Road, District 9, 4.25 miles of patching, milling,
bituminous concrete resurfacing and aggregate wedge shoulders on Raleigh Road
between Eldorado and Raleigh. Completion Date November 01, 2002. Southern
Illinois Asphalt Co., Inc., Marion, $386,986.
72. Will County, Richton Road, District 1, 1.20 miles bituminous pavement
reconstruction, concrete curb and gutter, drainage structures, bridge deck
reconstruction, landscaping and pavement marking on Richton Road from State
Street to Crete Road in Crete. 170 Working Days. Callaghan Paving, Inc., Burr
Ridge, $2,408,291.
73. Williamson County, IL 37, District 9, 1.90 km of patching, milling,
bituminous concrete base course widening, bituminous concrete resurfacing, curb
and gutter, building removal, storm sewers and traffic signals on IL 37 through
Johnston City. Completion Date October 31, 2003. George E. Jones Excavating,
LLC, Marion, $3,763,361.
74. WITHDRAWN
75. Cook County, Kedzie Avenue, District 1, 0.94 mile of milling and
bituminous concrete surface on Kedzie Avenue from 71st Street to IL 7 and bridge
rehabilitation on the structure carrying Kedzie Avenue over Belt Railway Company
Railroad all in Chicago. Completion Date October 30, 2003 Plus 15 Working Days.
All Concrete Construction, Inc., Burr Ridge, $3,338,000.
76. Effingham County, Unmarked Route, District 7, Improvement of a single
span, precast, prestressed concrete deck beam bridge and approaches carrying TR
300 over Little Bishop Creek, approximately one mile southeast of Elliottstown.
30 Working Days. Perry County Construction Co., Herrin, $98,690.
77. Logan County, Waynesville Road, District 6, scour protection with steel
sheet piling, stone riprap at the Waynesville Road bridge over Kickapoo Creek, 5
miles southeast of Atlanta. 20 Working Days. Sangamo Construction Co.,
Springfield, $148,989.
78. Peoria County, I-74, District 4, Removal and replacement of the structure
carrying Forrest Hill Avenue over I-74 in Peoria. Completion Date May 31, 2003.
Halverson Construction Co., Inc., Springfield, $3,199,999.
79. Cook County, Various Routes, District 1, Installation of emergency
vehicle preemption system at 47 intersections throughout the West Central
Municipal Conference (Berwyn Cicero and Stickney) 50 Working Days. H & H
Electric Co., Franklin Park, $235,425.
80. Kendall County, US 34, District 3, Installation of traffic signals at the
intersection of McHugh Street and US 34 in Yorkville including left and right
turn lanes and curb and gutter. 70 Working Days. D. Construction, Inc., Coal
City, $866,160.
81. Tazewell County, Cruger Road, District 4, 1.32 km of portland cement
concrete pavement with curb and gutter, storm sewer and other related work along
Cruger Road from Cummings Lane to Nofsinger Road in Washington. 90 Working Days.
R.A. Cullinan & Son, Inc., Tremont, $1,431,102.
82. Champaign County, Unmarked Route, District 5, viaduct rehabilitation
including sidewalks, lighting, drainage improvements and bicycle lockers on Main
Street, University Avenue and Chester Street viaducts in Champaign. 35 Working
Days. Duce Construction Co., Champaign, $216,170.
83. Henderson County, IL 164, District 4, Installation of a fire suppression
system to protect the wooden Oquawka Wag Bridge over Henderson Creek in the Rest
Area along IL 164 located 2 miles south of Oquawka. 30 Working Days. Hillyer,
Inc., Macomb, $227,800.
84. Jersey County, Unmarked Route, District 8, construction of three parking
lots located at Evans and Church Streets (West parking lot), Union and Mulberry
Streets (East parking lot, and near Route 3 and Sycamore Street Grove Memorial
Park parking lot in Grafton. 45 Working Days. RCS Construction, Inc., Wood
River, $269,510.
85. Livingston County, IL 116, District 3, 0.83 mile of intermittent
combination concrete curb and gutter removal and replacement, intermittent
concrete median surface removal and replacement, concrete median removal and
replacement located on IL 116 from Interstate 55 to Old Route 66. 20 Working
Days. H.J. Eppel & Co., Pontiac, $35,333.
86. Madison County, Various Routes, District 8, Crack and joint sealing at 10
locations in Madison County. The locations include I-55, I-55/70, IL 157, IL
203, US 40, IL 160 and IL 111. Completion Date November 17, 2002. Huff Sealing
Corp., Albion, $231,807.
87. Montgomery County, I-55, District 6, Waste water treatment improvements,
lavatory and hot water heater replacement at the I-55 Coalfield Rest Areas south
of Waggoner. 120 Working Days. Davinroy Mechanical Contractor, Inc., Belleville,
$651,120.
88. Sangamon County, I-55, District 6, 1.37 miles on intermittent from south
of the Williamsville Weigh Station north to the Sangamon/Logan County Line, and
longitudinal joint repair of the southbound lanes of I-55 from just south of the
Lake Springfield Bridge south for approximately 1.1 miles. 15 Working Days.
Illinois Valley Paving Co., Springfield, $146,208.
89. St. Clair County, I-70/55, District 8, Slope repair on I-70 in East St.
Louis. Completion Date October 02, 2002. C.D. Peters Construction Co., Granite
City, $16,603.
90. Champaign County, Olympian Drive, District 5, reconstruction of Olympian
Drive from Mattis Avenue to 0.5 mile east of Market Street in Champaign. Project
also includes work at intersections of Olympian Drive at Mattis Avenue, Prospect
Avenue and Market Street. Work includes PCC pavement with bituminous shoulders,
aggregate shoulders, combination concrete curb and gutter, drainage structures,
storm sewers, traffic signals, pavement marking and removal of existing
buildings. 175 Working Days. Stark Excavating, Inc., Bloomington, $6,149,911.
91. DeKalb County, Somonauk Road, District 2, 1.07 km of bituminous concrete
widening and resurfacing on Somonauk Road from IL 38 to North Street in
Cortland. Includes intersection improvement with new signals at IL 38. 125
Working Days. Rockford Blacktop Construction Co., Loves Park, $2,448,721.
92. Henderson County, Carman Road, District 4, 3.0 miles of bituminous
concrete resurfacing on Carman Road from US 34 south to Carman. 20 Working Days.
W.L. Miller Co., Hamilton, $487,720.
93. WITHDRAWN
94. Kankakee County, IL 1 & IL 17, District 3, 0.51 mile of milling and
bituminous concrete resurfacing at the south junction of IL 1 and IL 17 located
5.0 miles east Kankakee. 45 Working Days. Kankakee Valley Construction,
Kankakee, $185,586.
95. Lake County, IL 22, District 1, 3.00 km of roadway reconstruction,
retaining wall construction, traffic signal modernization and bridge
rehabilitation on IL 22 from east of IL 21/US 45 to west of Hewitt Drive in
Lincolnshire. Also widening and deck replacement of the IL 22 bridge over Indian
Creek and structure replacement on IL 22 over Des Plaines River. Completion Date
November 21, 2003 Plus 20 Working Days. Capitol Cement Co., Inc., Chicago,
$12,499,681.
96. WITHDRAWN
97. McDonough County, IL 41, District 4, 6.86 miles of patching, milling and
bituminous concrete resurfacing on IL 41 north of IL 9 to the US 1 intersection
near Bushnell. 25 Working Days. R.A. Cullinan & Son, Inc., Tremont, $698,407.
98. WITHDRAWN
99. WITHDRAWN
100. Sangamon County, IL 4, District 6, 1.25 miles of patching, milling,
widening for lane additions, bituminous concrete surface course, reconstruction,
turn lanes, building demolition and traffic signal updates on IL 4 from north of
Mason Road to north of Teal Drive in Chatham. Completion Date May 30, 2003.
Truman L. Flatt & Sons Co., Inc., Springfield, $1,472,234.
101. Bond County, IL 127/IL 140, District 8, Parapet repair and guardrail
replacement at the structure carrying IL 127/140 over Little Shoal Creek west of
Greenville. Completion Date November 01, 2002. Specialty Construction of
Illinois, Inc., Effingham, $17,866.
102. St. Clair County, I-255 (SB), District 8, resurfacing of the bridge
deck, replacement of the existing expansion joint at the north abutment and
resurfacing of the approaches at the structure carrying I-255 southbound over
Harding Ditch at Caseyville. 60 Working Days. Plocher Construction Co., Inc.,
Highland, $332,221.
103. Tazewell County, I-155, District 4, Removal and replacement of the
damaged girder on the structure carrying Allentown Road over northbound I-155.
20 Working Days. Halverson Construction Co., Inc., Springfield, $131,265.
104. Cook County, 39th Street (Pershing Rd), District 1, Traffic signal
modernization on 39th Street (Pershing Road) from Oak Park Avenue to Laramie
Avenue in Berwyn, Cicero and Stickney. 55 Working Days. H & H Electric Co.,
Franklin Park, $199,999.
105. Madison-St. Clair Counties, Various Routes, District 8, Traffic signal
modifications at the following intersection locations: (1) IL 203 and Pontoon
Road in Granite City (2) US 67 and Henry Street in Alton (3) US 67 and Ridge
Street in Alton (4)IL 111 and Hawthorne Street in Roxana (5) IL 3 and Monsanto
Avenue in Sauget (6) Lebanon Avenue and West Boulevard in Belleville and (7)
Carondelet Avenue/Dyroff Street and North Main Street in Dupo. 35 Working Days.
Electrico, Inc., Columbia, $61,807.
106. Champaign-Coles Counties, Various Routes, District 5, scour
countermeasures at existing structures at various locations. 45 Working Days.
Duce Construction Co., Champaign, $203,192.
107. Fulton County, US 24, District 4, 0.19 miles of roadway chip and seal
within the Little America Rest Area on US 24 east of Lewistown. 15 Working Days.
United Paving & Construction, Inc., Canton, $27,654.
108. Grundy County, Unmarked Route, District 3, Bituminous concrete
resurfacing on 1.6 miles of the Main Park Road and 6 existing parking lots,
extending the Main Park Road by 0.98 mile, constructing a new 1.14 miles one
way, one lane access road and five new parking areas in the Mazonia State Fish
and Wildlife Area near Braidwood. Completion Date July 01, 2003. D.
Construction, Inc., Coal City, $1,102,748.
109. Jefferson County, I-57/64, District 7, 5.40 miles of routing, cleaning
and sealing of transverse and longitudinal reflected cracks and joints in the
existing pavement on I-57/64 from the north tri-level to the south tri-level at
Mt. Vernon. 20 Working Days. Huff Sealing Corp., Albion, $49,741.
110. McLean County, IL 9 & IL 54, District 3, Crack and joint sealing on IL 9
from IL 122 northerly 7.2 miles to the Tazewell/McLean County line, on IL 9 from
Arrowsmith Road 10.7 miles to the Ford/McLean County line, and on IL 54 from
Bellflower south 5.6 miles to the DeWitt/McLean County line. 40 Working Days.
Beniach Construction Co., Inc., Hindsboro, $137,958.
111. Putnam County, IL 26, District 3, 0.42 miles of curb removal and
replacement on IL 26 from south of OR 26 to the South ramps of I-180. 15 Working
Days. Ladd Construction Co., Ladd, $48,363.
112. Tazewell County, IL 8, District 4, Demolition of two houses and a garage
on IL 8 one mile east of US 150 (Meadow Avenue) in East Peoria. 15 Working Days.
N.E. Finch Co., Peoria, $22,100.
113. WITHDRAWN
114. Various Counties, Various Routes, District 3, Crack and joint sealing on
IL 18 from IL 89, 6.2 miles east to I-39 in Putnam and LaSalle Counties; on IL
23 from Marilla Road (in Streator) 2.3 miles north to Richards Road, and on IL
116 from I-55 18.4 miles west of IL 251 in Livingston and Woodford Counties. 40
Working Days. Freehill Asphalt, Inc., Watseka, $127,268.
115. Various Counties, Various Routes, District 9, Minor grading of eroded
slopes, placement of topsoil, fertilizer, seed and straw mulch, and the
placement of riprap in eroded ditches on IL 127 south of Pinckneyville and on IL
13 between Harrisburg and the Williamsmon County Line. Completion Date November
15, 2002. George E. Jones Excavating, LLc, Marion, $103,525.
116. Woodford County, US 24, District 3, Cleaning and painting the structure
carrying US 24 over Panther Creek 4.0 miles west of El Paso. 30 Working Days.
Pannex Painting Co., Inc., Franklin Park, $114,300.
117. Jackson County, IL 13, District 9, addition of right turn lanes at three
of the four approaches to the intersection of IL 13 and Williams Street in
Murphysboro along with the installation of traffic signals. Completion Date:
December 20, 2002. E.T. Simonds Construction Co., Carbondale, $512,601.
118. Jefferson County, IL 15, District 7, 0.3 mile of widening and
resurfacing on IL 15 for the construction of left turn lanes at the intersection
with Liebengood Road at Mt. Vernon. 60 Working Days. Guinzy Construction, Inc.,
Ashley, $480,000.
119. Hamilton County, IL 242, District 7, removal of the existing single span
bridge carrying IL 242, over an unnamed creek approximately 5 miles north of
McLeansboro and the replacement with a triple barrel concrete box culvert. Also
included is the removal of the existing single span bridge carrying IL 242 over
an unnamed creek approximately 6 miles north of McLeansboro and the replacement
with a triple barrel concrete box culvert. Completion Date November 27, 2002.
Perry County Construction Co., Herrin, $793,008.
120. Iroquois County, I-57, District 3, Reconstruction of the structure
carrying US 24 over I-57 at the Gilman interchange. Completion Date July 01,
2003 Plus 20 Working Days. Iroquois Paving Corp., Watseka, $2,625,218.
121. WITHDRAWN.
122. Various Counties, Various Routes, District 7, Scour mitigation at 12
structures located on various routes throughout District 7. 65 Working Days.
Keeley & Sons, Inc., East St. Louis, $258,102.
123. Various Counties, Various Routes, District 1, Wetland management
consisting of planting, mowing and weed spraying at 7 various locations in the
district. Completion Date October 15, 2002. McGinty Bros., Inc., Long Grove,
$59,582.
124. WITHDRAWN
125. Clay County, Farina-Iola Blacktop, District 7, rehabilitation of a three
span concrete bridge with precast, prestressed concrete deck beams,
modifications to piers and abutments, aggregate approaches, carrying Farina-Iola
Blacktop over Crooked Creek, 1 mile west of Iola. 90 Working Days. Perry County
Construction Co., Herrin, $246,853.
126. Madison-St. Clair Counties, Various Routes, District 8, The installation
of 7 surveillance cameras on various interstate routes in Madison and St. Clair
Counties. Completion Date April 01, 2003. Electrico, Inc., Columbia, $441,276.
127. Grundy County, I-55 & OR 66, District 3, 5.39 miles of bituminous
concrete resurfacing on Interstate 55 and Old Route 66 from one mile northeast
of the Illinois 47/I-55 interchange at Dwight to the Gardner interchange.
Completion Date June 01, 2003 Plus 15 Working Days. D. Construction, Inc., Coal
City, $8,211,230.
128. Champaign-Edgar-Vermilion Counties, IL 49, District 5, 11.73 miles of
milling and bituminous concrete resurfacing on IL 49 from Homer to 0.6 mile
south of the Vermilion Co. Line. 60 Working Days. Champaign Asphalt Co.,
Champaign, $1,762,543.
129. Logan County, I-55, District 6, 15.3 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, bituminous
shoulders, aggregate shoulders and repairs on 11 structures on I-55 from the
Sangamon County line to I-155 northwest of Lincoln. Completion Date October 01,
2003. Illinois Valley Paving Co. & Truman L. Flatt & Sons Co., Inc.,
Springfield, $19,402,776.
130. Livingston County, I-55, District 3, 6.98 miles of bituminous concrete
resurfacing and structure repairs on I-55 from the McLean County line to 1.7
miles south of Illinois 116 at Pontiac. Completion Date August 15, 2003 Plus 10
Working Days. Tobey's Construction & Cartage, Inc. & T&T Cartage, Inc.,
Herscher, $9,467,980.
131. McLean County, I-55, District 3, 9.85 miles of patching and bituminous
concrete resurfacing on Interstate 55 from just south of Lexington interchange
to the Livingston County line near Chenoa. Completion Date December 01, 2003.
Rowe Construction Co., Bloomington, $17,934,743.
132. Logan County, IL 10, District 6, Intersection reconstruction on Illinois
10 with relocated 740th Avenue, relocated 757th Avenue, relocated 560th Avenue,
and TR85 from just north of New Holland to approximately 2 miles west of I-55
west of Lincoln. Completion Date September 27, 2002. Illinois Valley Paving Co.,
Springfield, $562,511.
133. WITHDRAWN
134. Christian County, IL 29, IL 16, US 51, District 6, 4.54 miles of
pavement patching, bituminous surface removal, widening, and resurfacing,
bituminous shoulders, aggregate shoulder, PCC Sidewalk and traffic signal
installations on the following roadways in Pana: (1) Illinois 29/Washington
Street from 0.2 mile north of Pana to Hickory Street (2) Poplar Street from
Washington Street to south of Fifth Street (3) First Street/US 51/Illinois 16
from Poplar Street to Spruce Street and (4) US 51 from Cold Spring Road in Pana
to the Shelby County line. Completion Date August 01, 2003. Illinois Valley
Paving Co., Springfield, $2,229,400.
135. Bureau-Henry-Rock Island Counties, Unmarked Route, District 2, 0.09 mile
of roadway and parking improvements at the Hennepin Canal Visitors Center and
several Hennepin Canal Park locations. 45 Working Days. Advanced Asphalt Co.,
Princeton, $341,621.
1A. Salem-Leckrone Airport, Salem, Marion County, Install perimeter fencing -
Phase 1. Hodges Fence Erectors, Edgewood, $34,618.
2A. St. Louis Regional Airport, East Alton, Madison County, Construct
Corporate Apron, Taxiway and Entrance Road. RCS Construction, Inc., Wood River,
$479,850.
3A. Capital Airport, Springfield, Sangamon County, Construct New Access Road
to Charlie Ramp Area. Truman L. Flatt & Sons Co., Inc., $269,845.
4A. Rantoul National Avaiation Center, Rantoul, Champaign County, Install
Security Fence. Access Control Co., Inc., Rock Island, $217,880.
5A. Whiteside County Airport, Sterling, Whiteside County, Rehabilitate North
Terminal Apron. Bob Propheter Construction, LLC, Sterling, $370,799.
6A. Southern Illinois Airport, CarbondaleJackson County, Rehabilitate Runway
6/24 Medium Intensity Runway Lights (MIRLS); PCALS & REILS. Bodine electric of
Decatur, Decatur, $71,528.
7A. Greater Rockford Airport, Rockford, Winnebago County, Construct Midfield
Automobile Parking, Including Grading and Drainage. Rock Road Companies, Inc.,
Janesville, WI, $113,941.
8A. Statewide AWOS System, Construct Automated Weather Observation Systems
(AWOS) with graphic weather display and NADIN linking At Carmi, Litchfield,
Metropolis, Robinson and Savanna Tri-Township airports. J.F. Edwards
Construction Co., Geneseo, $746,000.
9A. Aurora Municipal Airport, Aurora, Kane County, Construct Parallel Taxiway
to Runway 9/27. Sjostrom & Sons, Inc., Rockford, $3,824,666.
10A. Greater Rockford Airport, Rockford, Winnebago County, Rehabilitate West
Terminal Apron. Sjostrom & Sons, Inc., Rockford, $3,284,908.
11A. Quincy Regional Airport, Quincy, Adams County, Re-Mark Runway 4/22. No
Bids.
12A. Quincy Regional Airport, Quincy, Adams County, Install Perimeter Fence.
Lovewell Fencing, Inc., Davenport, IA, $396,464.
13A. Southern Illinois Airport, Carbondale, Jackson County, Construct
Wildlife/Security Fence. Terrace Fence Co., Marion, $723,386.
14A. Williamson County Regional Airport, Marion, Williamson County, Runway
2/20 Extension, Phase 1 (grading and drainage). Gibbs Construction, Modesto,
$464,690.
15A. Capital Airport, Springfield, Sangamon County, Extend Taxiway B, Remove
Portion of Taxiway E. Truman L. Flatt & Sons Co., Inc., Springfield, $1,283,651.
16A. Palwaukee Municiapl Airport, Prospect Heights, Cook County, Construct,
Light & Mark Northwest Parallel Taxiway to Runway 16/34 from 16 to Taxiway L2
(Phase 2); Rehabilitate Taxiway D, Y & Z Lighting System. Greco Contractors,
Inc., Des Plaines, $1,250,385.
17A. Quad-City International Airport, Moline, Rock Island County, Construct
10 foot Security Fence with gates to complete the perimeter fencing of the
airport. Access Control Co., Inc., Rock Island, $301,219.
18A. DuPage Airport, West Chicago, DuPage County, Construct South Flight
Center Auto Parking Lots, Phase 1 & 2. Plote Construction, Inc., Elgin,
$758,861.
1LR. PEORIA County, Reclamation of the Lucky Strike Mine. The proposed
reclamation project is located on the west edge of Peoria, just west of Koerner
Road. The work includes approximately 3,091 cu yds of earth excavation, 2,580 cu
yds of mine refuse excavation, 931 cu yds of special excavation, 598 tons tons
of riprap fill C-3, 252 tons of CA-6 fill, 174 tons of CA-1 fill, 2,368 sq yds
of special excelsior blanket, the sealing of two mine openings, and seeding and
soil amendments for 1.4 acres. Oatman Construction, Inc., Canton, $60,699.
1W. JACKSON County, Crisenberry Dam Spillway Erosion Project, Kinkaid Lake.
Located at the Crisenberry Dam at Kinkaid Lake approximately 7 miles west of
Murphysboro, reinforce an existing rock spillway by constructing a concrete
apron slab (240' x 53') and installing a grout curtain in rock (250' long x 20'
deep) just upstream of the spillway; includes 1,259.2 cu yds concrete
structures; 76,640 lbs reinforcement bars 172 each furnishing and grouting
anchor rods; installing a grout curtain in rock (250' long x 20' deep); 121 cu
yds concrete removal; 110 each PVC drains; 136 cu yds removal of prepack
concrete; 96 cu yds rock excavation; 12,710 sq ft texturizing concrete; 6,574
gals bituminous materials; 88 ton cover coat aggregate; 110 tons seal coat
aggregate; 3,072 ft cleaning and painting existing chain link fence; 1,900 sq ft
cleaning and painting. Plocher Construction Co., Inc., Highland, $679,069.
###
|