| FOR IMMEDATE RELEASE | CONTACT: 217-782-6953 |
| JULY 8, 2003 | TTY: 217-524-4875 |
SPRINGFIELD, IL -- The Illinois Department of Transportation is
seeking consultants for 30 highway projects across the state.
Interested prequalified consultant firms may submit their statements
of interest on or before June 12, 2003.
The consultants will be selected on August 13.
The projects are:
- COOK, construction inspection for lighting and interchange work on I-94/90
(Dan Ryan Expressway) from 31st St. to I-57.
- COOK, construction inspection for structure projects on I-94/90 (Dan Ryan
Expressway) from 31st St. to I-57.
- COOK, construction inspection for storm sewer work on I-94/90 (Dan Ryan
Expressway) from 31st St. to I-57.
- DISTRICT 1, value engineering on various projects throughout the district.
- DISTRICT 1, land surveys at various locations throughout the district.
- DISTRICT 1, construction inspection on various projects throughout the
district.
- DISTRICT 1, construction inspection on various projects throughout the
district.
- WHITESIDE, Phase II Engineering for the improvement of US 30 from west of IL
78 to east of French Creek through Morrison.
- DISTRICT 2, land surveys at various locations throughout the district.
- WHITESIDE, land surveys along US 30 from west of IL 78 to east of French
Creek through Morrision.
- HENRY/ DE KALB/ BUREAU/ WHITSIDE/ WINNEBAGO, preparation of project reports
and/or plans for five structures.
- DISTRICT 2, Phase I and/or II engineering on various projects throughout the
district.
- DISTRICT 2, Phase I and/or II engineering on various projects throughout the
district.
- DISTRICT 3, Phase I and/or II engineering on various projects throughout the
district.
- DISTRICT 3, Phase I and/or II engineering on various projects throughout the
district.
- DISTRICT 3, subsurface utility engineering on various projects throughout
the district.
- DISTRICT 3, bridge deck thermography throughout the district.
- DISTRICT 4, bridge deck thermography throughout the district.
- McDONOUGH, Phase II engineering for US 136 east of Macomb to north of
Industry.
- PEORIA, construction inspection on I-74 from west of Sterling Ave. to
Nebraska Ave.
- DISTRICT 4, construction inspection on various projects throughout the
district.
- TAZEWELL, construction inspection on I-74 from the Illinois River to east of
Washington St. and Camp St.
- SANGAMON / CHRISTIAN, Phase II engineering for IL 29 from south of Berry to
south of Edinburg.
- DISTRICT 7, penetrating radar bridge deck surveys throughout the district.
- EFFINGHAM, Phase I and II engineering for the rehabilitation of I-70/57 from
the north Tri-Level interchange to the south Tri-Level interchange.
- MADISON / ST. CLAIR, Phase I and II engineering to supplement work for the
new Mississippi River bridge.
- MONROE / ST. CLAIR, land surveys along IL 158 from IL 3 in Columbia to IL 15
in Belleville.
- STATEWIDE, photogrammetric services for the northern area of the state.
- STATEWIDE, evaluation of aluminum highway sign truss design, and review of
traffic structures standards.
- STATEWIDE, investigation of select LRFD design factors through
instrumentation of bridge bearings.
###
|