SPRINGFIELD, IL -- The Illinois Department of
Transportation is seeking consultants for 34 highway projects across
the state. Consultants will be selected on May 21.
The projects are:
- COOK, construction inspection for embankment and four
structures on I-80/94 from IL 394 to US 41.
- COOK, construction inspection for roadway and interchange work
on I-80/94 from IL 394 to US 41.
- COOK, construction inspection for structure, roadway, and
lighting surveillance work on I-80-94 from IL 394 to US 41.
- DISTRICT 1, subsurface utility engineering on various projects
throughout the district.
- DISTRICT 1, construction inspection on various projects
throughout the district.
- COOK, land surveys along IL 21 from north of Sanders Rd. to
south of Euclid Ave.
- DISTRICT 1, land surveys at various locations throughout the
district.
- DISTRICT 1, drainage studies and hydraulic reports for various
locations throughout the district.
- DISTRICT 1, geotechnical reports for various locations
throughout the district.
- DISTRICT 1, land surveys at various locations throughout the
district.
- LAKE, preliminary engineering and environmental studies from
IL 60 and I-94.
- DISTRICT 2, land surveys at various locations throughout the
district.
- DISTRICT 2, land and route surveys for various locations
throughout the district.
- DISTRICT 4, land and route surveys throughout the eastern
portion of the district.
- DISTRICT 4, land and route surveys throughout the western
portion of the district.
- McDONOUGH, construction inspection for the 4-lane construction
of US 136 from west of TR 226 to CH 18 west of Macomb.
- KNOX, construction inspection for roadway and bridge work on
IL 41 just south of Galesburg.
- DeWITT & PIATT, construction inspection for 13.5 miles of
patching and resurfacing on IL 10 from IL 48 at Weldon to west
of I-72.
- MACON & MOULTRIE, construction inspection for resurfacing 22
miles of US 36 from Maryland St. east of Decatur to the Douglas
County line.
- DISTRICT 5, construction inspection for various contracts
throughout the district.
- DISTRICT 5, Phase I and/or Phase II work on various projects
throughout the district.
- CHAMPAIGN, construction inspection for 7 miles of resurfacing
on IL 130 from Madison St. in Philo to US 150 in Urbana.
- DISTRICT 6, Phase I and/or Phase II work on various projects
throughout the district.
- DISTRICT 6, Phase I and/or Phase II work on various projects
throughout the district.
- DISTRICT 6, Phase I and/or Phase II work on various projects
throughout the district.
- DISTRICT 6, route and land surveys throughout the district.
- ST. CLAIR, Phase II engineering for the rehabilitation of the
Bowman Ave. pump station.
- DISTRICT 8, construction inspection for various projects
throughout the district.
- ST. CLAIR, construction inspection for two projects on the
I-55/70/64 and US 40 Poplar Street Complex. 1) Rehabilitation of
the Tudor/Piggot ramps and roadways; 2) Rehabilitation of the IL
3 ramps and roadways.
- WILLIAMSON & JACKSON, feasibility report for future
improvements the IL 13 corridor between Marion and Murphysboro.
- STATEWIDE, quality assurance/control for various airport
improvement projects throughout the state.
- STATEWIDE, prepare plans for various bridge projects
throughout the state.
- STATEWIDE, evaluation of aluminum highway sign truss design
details and review of traffic structures standards.
- STATEWIDE, investigate select LRFD design factors through