SPRINGFIELD, IL -- The Illinois Department of Transportation received
bids on March 7, 2003 for various road and bridge
improvement projects located throughout the state. Also included were
24 aeronautics projects and one land reclamation project.
Following is a list of the projects by county and the apparent low
bidder:
1. Adams County, US 24, District 6, Contract No. 72753, 2 miles of pavement
patching, bituminous concrete resurfacing and 3 ft width aggregate shoulders on
US 24 between Clayton and IL 94. 25 Working Days. R.L. Brink Corp., Quincy,
$183,142.
2. Cook County, IL 394, District 1, Contract No. 62422, 3.64 miles of milling
and bituminous concrete surface on IL 394 from Thornton-Lansing Road to Joe Orr
Road in Lansing, Glenwood and Lynwood. Completion Date August 28, 2003 Plus 10
Working Days. Callaghan Paving, Inc., Burr Ridge, $3,143,966.
3. DuPage County, IL 59, District 1, Contract No. 62294, 1.42 miles of
milling and bituminous concrete surface on IL 59 from Glacier Park to McCoy
Drive in Aurora and Naperville. Completion Date July 18, 2003 Plus 05 Working
Days. Harry W. Kuhn, Inc., Wheaton, $701,645.
4. Fayette County, I-70, District 7, Contract No. 94906, 3.21 miles of
pavement patching, bituminous surface removal, bituminous concrete resurfacing,
6 ft and 10 ft width bituminous shoulders and 2 ft width aggregate shoulders on
I-70 east of Vandalia from the Kaskaskia River bridge east to 1 mile west of US
40. 80 Working Days. Howell Asphalt Co. & Howell Paving, Inc., Mattoon,
$2,630,235.
5. Hancock County, IL 94, District 6, Contract No. 72417, pavement patching,
bituminous surface removal, bituminous concrete resurfacing and 3 ft width
aggregate wedge shoulders on IL 94 from Powellton Road south 4.02 miles to just
northeast of Ferris. 35 Working Days. W.L. Miller Co., Hamilton, $449,449.
6. McHenry County, IL 120, District 1, Contract No. 62226, 2.14 miles of
milling and bituminous concrete surface on IL 120 from US 14 to Throop St. in
Woodstock. 30 Working Days. Curran Contracing Co., Crystal Lake, $393,410.
7. Montgomery County, I-55 East Frontage Road, District 6, Contract No.
72752, 2 miles of pavement patching, bituminous concrete resurfacing and 3 ft
width aggregate shoulders on the I-55 East Frontage Road between Litchfield and
IL 108. 25 Working Days. Macoupin County Contracting, Inc., Staunton, $261,850.
8. Montgomery County, I-55 West Frontage Road, District 6, Contract No.
72756, 2 miles of pavement patching, bituminous concrete binder and surface
courses and 6 ft width aggregate shoulders on the I-55 West Frontage Road north
of Farmersville. 25 Working Days. Illinois Valley Paving Co., Springfield,
$450,448.
9. Pike County, IL 100, District 6, Contract No. 72146, 5.96 miles of
pavement patching, bituminous surface removal, bituminous concrete resurfacing,
5 ft and 3 ft width bituminous shoulders, 3 ft width aggregate shoulders,
guardrail removal and installation on IL 100 between Milton and Pearl.
Completion Date November 30, 2003. Illinois Valley Paving Co., Springfield,
$1,435,649.
10. Pike County, IL 106, District 6, Contract No. 72761, 2.40 miles of
pavement patching, bituminous surface removal, bituminous concrete resurfacing
and 3 ft width aggregate shoulders on IL 106 west of Pittsfield beginning near
US 54 and extending northwest. 25 Working Days. Diamond Construction Co.,
Quincy, $241,327.
11. Williamson County, IL 148, District 9, Contract No. 98778, West of Marion
at the intersection of IL 148 and Old IL 13/West Main Street the southbound left
turn lane will be reconstructed and a northbound left turn lane will be added to
IL 148. On West Main Street a left-turn lane and a right turn lane will be added
and new traffic signals will be installed at the intersection. Completion Date
August 29, 2003 Plus 08 Working Days. George E. Jones Excavating, LLC, Marion,
$725,013.
12. Williamson County, IL 13, District 9, Contract No. 98757, IL 13 in Marion
at the intersection with North Carbon Street, the work will consist of pavement
removal, PCC pavement, a bituminous inlay, detector loops and the modification
of an existing controller cabinet. Also, included is work on eastbound IL 13
between Russell Street and Bentley Street and on westbound IL 13 between Russell
Street and the EN Baker entrance consisting of bituminous shoulder installation.
Completion date July 31, 2003. E.T. Simonds Construction Co., Carbondale,
$489,827.
13. Cook County, IL 7, District 1, Contract No. 62535, Deck beam support
system for the structure carrying IL 7/Southwest Highway over B & OCT Railroad,
Melvina Ditch and Stony Creek in Chicago Ridge. 15 Working Days. D.
Construction, Inc., Coal City, $189,605.
14. Cook County, US 20 (Lake Street), District 1, Contract No. 62092, Removal
and replacement of the superstructure of the US 20-Lake St. bridge over IL 64
(North Ave); reconstruction of the intersection of US 20 and Railroad Ave. and
retaining wall construction, lighting and traffic signal installation all in
Northlake, Addison, Leyden, York and Proviso. Completion Date October 31, 2003
Plus 05 Working Days. Dunnet Bay Construction Co., Glendale Heights, $2,501,600.
15. Jackson County, IL 4, District 9, Contract No. 98609, The removal of the
existing 3 span bridge carrying IL 4 over Rattlesnake Creek southwest of
Vergennes and replacement with a 3 span, continuous composite concrete and steel
beam. 110 Working Days. E.T. Simonds Construction Co., Carbondale, $934,736.
15P. Madison County, IL 255, District 8, Contract No. 76527, reconstruction
of Wood Station Road on new vertical and horizontal alignments and the
construction of a 2 span, continuous composite concrete and steel web plate
girder structure on vaulted abutments to carry Wood Station Road over proposed
IL 255 northeast of Alton. Completion Date July 01, 2004. River Bend
Contractors, Inc., South Roxana, $1,822,382.
16. Madison County, I-55/70, District 8, Contract No. 76620, 50 feet of
bridge repair on the eastbound I-55/70 bridge over Wilson Avenue south of
Maryville consisting of beam replacement and superstructure removal and
replacement. 15 Working Days. Plocher Construction Co., Inc., Highland, $76,135.
17. Stark County, IL 17, District 4, Contract No. 88802, Removal and
replacement of the structure carrying IL 17 over Camp Run Creek Tributary
located 3.8 miles east of Wyoming. 35 Working Days. Hillyer, Inc., Macomb,
$194,019.
18. Wayne County, IL 15, District 7, Contract No. 94914, removal of the
bituminous wearing surfaces and waterproofing membrane systems, partial and full
depth deck patching, keyway repair, formed concrete repairs, new expansion
joints, concrete wearing surfaces and new guardrail at 4 structures on IL 15 at
the following locations east of Fairfield: (1) over Pond Creek 1.5 miles east of
Fairfield (2) over an unnamed stream 4 miles west of the Edwards County Line (3)
over Whiteoak Overflow 1.5 miles west of the Edwards County line and (4) over an
unnamed stream 0.9 mile west of the Edwards County line. 90 Working Days.
Sangamo Construction Co., Springfield, $683,109.
19. Cook County, IL 43, District 1, Contract No. 62209, Traffic signal
modernization on IL 43 from 32nd St. to 34th St. in Riverside. 35 Working Days.
Hawk Enterprises, Inc. of Indiana, Crown Point, IN, $126,927.
20. Madison-St. Clair Counties, IL 162 & IL 203, District 8, Contract No.
76643, Modernization of traffic signals at the following intersections:(1) IL
162 and IL 203 (Nameoki Road) at Granite City (2) IL 203 and 20th Street at
Granite City (3) IL 162 at Mockingbird Lane and CH 35 (Horseshoe Lake Road) at
Granite City (4) IL 203 and Ohio Avenue/Landfill/Raceway at Madison and (5) IL
203 at Big Bend Road/Eagle Park Road at Madison. 25 Working Days. Wissehr
Electric, Inc., Belleville, $59,933.
21. Cook County, State Street, District 1, Contract No. 62453, Concrete
pavement patching on State Street from south of Sauk Trail to north of Steger
Road in South Chicago Heights and Steger. 20 Working Days. D. Construction,
Inc., Coal City, $175,228.
22. Cook County, Various routes, District 1, Contract No. 62462, Bridge
parapet repair and fence repair for bridges at various locations. 45 Working
Days. Western Remac, Inc., Woodridge, $154,200.
23. DuPage/Will Counties, I-55 & I-80, District 1, Contract No. 62482, Bridge
painting at 1 location on I-55 and 3 locations on I-80 in DuPage and Will
Counties. 50 Working Days. Atlas of Lake Station Paintxing, Lake Station, IN,
$227,500.
24. Madison County, IL 255, District 8, Contract No. 76630, The work will
consist of planting and caring for 20,900 seedlings as part of the tree
mitigation on 49 acres along the west side of IL 255 between the Wagon Wheel
Road and the Cahokia Diversion Channel and east of the Union Pacific Railroad at
Roxana. 15 Working Days. Nollau Nurseries, Inc., Smithton, $77,715.
25. Madison County, Horseshoe Lake Rd (CH 35), District 8, Contract No.
76511, The removal of the three corrugated metal pipe culverts on Horseshoe Lake
Road 0.30 mile west of IL 111 at Pontoon Beach and replacement with a 10' X 8'
precast concrete box culvert. 20 Working Days. Plocher Construction Co., Inc.,
Highland, $255,852.
26. Saline County, IL 13, District 9, Contract No. 98779, Demolition of 26
state acquired buildings for the relocation of IL 13 through Harrisburg. 30
Working Days. Pinoy Construction, Inc., Harrisburg, $110,042.
27. St. Clair County, IL 15, District 8, Contract No. 76628, removal of the
existing guardrail turn-down terminals in the median of east leg of the
intersection of IL 15 and the entrance to Our Lady of the Snow Shrine in
Belleville and the replacement with a traffic barrier terminal. Completion Date
May 31, 2003. Plocher Construction Co., Inc., Highland, $30,830.
28. St. Clair County, Various Routes, District 8, Contract No. 76631, Crack
routing and sealing at the following locations in St. Clair County: (1) 2.6
miles on Salem Place from IL 159 to Old US 50 at Fairview Heights and O'Fallon
(2) 0.40 mile on Boul Avenue from Morgan Street to IL 159 at Swansea (3) 1 mile
on IL 158 from IL 161 to IL 177 southeast of Shiloh (4) 1.15 miles on US 50 from
just west of Old US 50 to just east of Old US 50 at Summerfield (5) 4.5 miles on
IL 161 from Old IL 158 to east of IL 4 north of Mascoutah (6) 3.0 miles on Old
US 50 from US 50 to the Clinton County Line east of Summerfield (7) 1.65 miles
on Foley Drive from Millie Street to Main Street at Belleville and (8) 0.60 mile
on Shiloh Valley Township Line Road northeast of Shiloh. Completion Date June
20, 2003. Kinney Contractors, Inc., Raymond, $74,566.
29. Lake County, Various routes, District 1, Contract No. 44810, Applying
assorted types and widths of paint pavement markings at various locations.
Completion Date November 01, 2003. Preform Traffic Control Systems, Ltd., Des
Plaines, $171,620.
30. Various County, Various routes, District 1, Contract No. 44808, Removal
of assorted types, widths and sizes of pavement markings at various locations.
Completion Date June 30, 2004. Maintenance Coatings Co., South Elgin, $208,701.
31. Various County, Various routes, District 1, Contract No. 44809,
Installing raised reflective pavement markers at various locations. Completion
Date November 01, 2003. Superior Road Striping, Inc., Bensenville, $317,500.
32. Various County, Various routes, Districts 8 & 9, Contract No. 44807,
repairing various widths of thermoplastic preformed plastic, epoxy, hot spray
thermoplastic and polyurea pavement marking lines, letters and symbols and the
removal of existing pavement markings on various routes throughout Districts 8 &
9. Completion Date June 30, 2004. A.C. Pavement Striping Co., Elgin, $472,942.
33. Will County, I-80, District 1, Contract No. 62486, Cleaning and painting
of bridges along I-80 at four locations from IL 53 to Richard Street in Joliet.
50 Working Days. Icarus Indistrial Painting & Contracting Co., Inc., Valparaiso,
IN, $285,000.
34. Will County, I-57, District 1, Contract No. 62492, Peotone Weigh Station
repairs located 3.6 miles north of Peotone (I-57 NB) and 3.9 miles north of
Peotone (I-57 SB). 20 Working Days. Lyons Electric Co., Inc., Lyons, $208,450.
35. Ogle-Winnebago Counties, I-39, District 2, Contract No. 64797,
Reconstruction of the existing slopes in three areas, reestablishing existing
ditch flow lines and maintenance of existing drainage structures on Interstate
39 from the Lee/Ogle County line to 1.53 miles north of the Winnebago line. 55
Working Days. Bob Propheter Construction, LLC, Sterling, $2,875,670.
36. Clay County, CH 4, District 7, Contract No. 95353, reconstructing the
existing roadway with an 8" soil cement base course, from Jasper County Line to
FAS Route 799. 30 Working Days. Mt. Carmel Sand & Gravel Co., Inc., Mt. Carmel,
$481,199.
37. Cook County, Busse Rd / Landmeier Rd, District 1, Contract No. 83609,
0.60 miles of widening and resurfacing, curb and gutter, medians, sidewalks,
traffic signals, landscaping and pavement markings at the intersection of IL 83
and Landmeier Rd in Elk Grove. Completion Date November 14, 2003. Martan
Construction, Inc., Elgin, $2,375,175.
38. Cook County, Washington Avenue, District 1, Contract No. 83673, 2,106
feet of reconstruction, widening and resurfacing, drainage, water main, pavement
marking and landscaping on Washington Avenue from Maple Avenue to Prairie Avenue
and Veteran's Circle in Brookfield. Completion Date August 15, 2003. Triggi
Construction, Inc., West Chicago, $1,110,872.
39. DeWitt County, US 51 BUS 51, District 5, Contract No. 90792, 3.45 miles
of bituminous concrete resurfacing, storm sewer upgrade, geometric and safety
improvements along BUS 51 Bypass (N) to U.S. 51 Bypass (S) in Clinton.
Completion Date September 13, 2003. Freesen, Inc., Springfield, $2,383,127.
40. DuPage County, Unmarked Route, District 1, Contract No. 83674 grinding
and resurfacing with level binder, area reflective crack control, and bituminous
surface course of 2.2 miles on Main Street and Fairview Avenue in Downers Grove.
45 Working Days. Harry W. Kuhn, Inc., Wheaton, $784,043.
41. Edwards County, CH 1, District 7, Contract No. 95345, repairing the
existing base and 2.46 miles of bituminous resurfacing, aggregate shoulders and
related services on County Highway 1 from Bone Gap north. 15 Working Days.
Howell Paving, Inc. & Wabash Asphalt Co., Inc., Mattoon, $335,429.
42. Kankakee County, IL 113, District 3, Contract No. 66248, 8.3 miles of
milling and resurfacing on IL 113 from north of Tower Road near Kankakee to the
Will County line. Completion Date July 01, 2003. Iroquois Paving Corp., Watseka,
$566,437.
43. Moultrie County, CH 4, District 5, Contract No. 91273, rubblizing
approximately 1.23 miles of existing non-reinforced PCC pavement and resurfacing
the entire length with 6" thickness bituminous concrete pavement, providing
aggregate shoulders and pipe underdrains on both sides, as well as other work
incidental to completing these improvements to Bruce-Findlay Road, approximately
2.5 miles east of the Shelby County Line in Moultrie County. 50 Working Days.
Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $605,313.
44. Peoria County, IL 116, District 4, Contract No. 68296, 1.32 miles of
bituminous concrete resurfacing on IL 116 from Griswald Street to Adams Street
in Peoria. 25 Working Days. R.A. Cullinan & Son, Inc., Tremont, $308,321.
45. Richland County, CH 9, District 7, Contract No. 95344, Reconstructing the
existing surface with an 8" soil cement base course on CH 9 beginning at Pureton
extending northerly for 8.96 miles. 30 Working Days. Mt. Carmel Sand & Gravel
Co., Inc., Mt. Carmel, $627,680.
46. Rock Island County, 23rd Avenue, District 2, Contract No. 85257, 0.139
mile replacement of pavement, curb and gutter, sidewalks and signals on 23rd
Avenue from 24th Street to 27th Street in Moline. 90 Working Days. Walter D.
Laud, Inc., East Moline, $1,078,401.
47. WITHDRAWN
48. Vermilion County, Henning Road, District 5, Contract No. 90335, 10.75
miles of bituminous concrete resurfacing on Henning Road from US 136 to Hungry
Hollow Road northwest of Danville. Completion Date August 15, 2003 Plus 05
Working Days. University Construction, Urbana, $2,196,000.
49. Vermilion County, IL 49, District 5, Contract No. 90911, 14.19 miles of
bituminous concrete resurfacing on IL 49 from US 136(W) to US 150 west of
Fithian. 65 Working Days. Champaign Asphalt Co., Champaign, $2,259,553.
50. Whiteside County, Lynn Boulevard, District 2, Contract No. 85307, 0.474
mile of earth excavation, aggregate base course with aggregate shoulders, pipe
culverts and other related appurtenances. 30 Working Days. Foley Construction
Co., Bettendorf, IA, $298,817.
51. Christian County, CH 8, District 6, Contract No. 93336, Construction of a
two span, precast, prestressed concrete deck beam bridge and approaches carrying
CH 8 over Locust Creek, 2.0 miles west of Owaneco. 55 Working Days. Sparks &
Wiewell Construction Co., Quincy, $368,895.
52. Cook County, Wood Street, District 1, Contract No. 62038, Removal of the
existing structure and replacement with a 3-sided precast concrete structure
carrying Wood Street over Cal-Union Drainage Ditch in Markham. Completion Date
September 30, 2003 Plus 10 Working Days. D. Constuction, Inc., Coal City,
$640,048.
53. Macon County, CH 28, District 5, Contract No. 91244, Construction of a
single span, precast prestressed concrete deck beam bridge carrying CH 28 over a
tributary to Sangamon River, 5 miles west of Decatur on Mt. Auburn Blacktop. 35
Working Days. Sparks & Wiewel Construction Co., Quincy, $224,294.
54. Perry County, Park Road, District 9, Contract No. 99174, Construction of
a single span, precast, prestressed concrete deck beam bridge carrying TR 71
(Park Road) over Little Beaucoup Creek, 5.4 miles west of Tamaroa. 25 Working
Days. Dees, Inc., West Frankfort, $118,200.
55. Pulaski County, CH 3, District 9, Contract No. 99178, Construction of a
single span precast prestressed concrete deck bridge over the Cache River and
reconstruction of approximately 465 ft of CH 3, 0.2 miles north of IL 169. 35
Working Days. Perry County Construction Co., Herrin, $153,956.
56. Shelby County, CH 23, District 5, Contract No. 91268, Construction of a
single span, precast, prestressed concrete deck beam bridge carrying CH 23 over
Henry Creek, one mile west of Sigel. 60 Working Days. Sparks & Wiewel
Construction Co., Quincy, $235,918.
57. Tazewell County, US 150, District 4, Contract No. 88801, Removal /
demolition of the structure carrying US 150 over the abandoned Penn R.R. and
replacement with a cast-in-place box culvert for a future bike path located 0.3
mile west of Veterans Road in Morton. Completion Date November 30, 2003 Plus 15
Working Days. Freesen, Inc., Springfield, $1,472,876.
58. Tazewell County, US 150/24, District 4, Contract No. 68350, Replacement
of the joints on the McCluggage Bridge (WB only) carrying IL 150/24 over the
Illinois River in East Peoria. Completion Date June 30, 2003. Midwest Foundation
Corp., Tremont, $493,984.
59. Cook County, IL 68, District 1, Contract No. 83642, Intersection and
transition lighting will be provided at the intersections of Dundee Road and
Arlington Heights Road and also the intersection of Dundee Road and Buffalo
Grove Road in Buffalo Grove. 85 Working Days. Home Towne Electric, Inc., Lake
Villa, $456,149.
60. DeKalb County, IL 23, District 2, Contract No. 64806, Traffic signal
modernization and intersection channelization at IL 23 and IL 38 in DeKalb. 15
Working Days. D.R. Gilbert & Sons, Inc., Rochelle, $139,821.
61. Lake County, IL 83, District 1, Contract No. 60715, Traffic signal
modernization at the intersection of IL 83 at Shorewood Road in Grayslake. 35
Working Days. Home Towne Electric, Inc., Lake Villa, $117,990.
62. Cook County, Various routes, District 1, Contract No. 83675, 1.22 miles
of portland cement concrete sidewalk at various locations on Belle Drive,
Country Club Drive, Charles Drive and Hillside Avenue in Northlake. 40 Working
Days. M.Q. Construction Co., Elk Grove, $322,233.
63. Cook-Will Counties, Various routes, District 1, Contract No. 62497, Crack
and joint routing and sealing along various routes in Cook and Will Counties. 25
Working Days. Kenneth R. Hartman, Inc., Kankakee, $607,340.
64. DuPage County, US 34/Ogden Ave., District 1, Contract No. 83657, 1.81
miles of PCC sidewalk improvements and pedestrian traffic signals on US 34/Ogden
Avenue, from Radcliff Road to Old Tavern Road, and from River Drive to Ivan
Avenue in Lisle. 40 Working Days. M.Q. Construction Co., Elk Grove, $368,484.
65. Jersey County, Fairgrounds Ave. & June St., District 8, Contract No.
97206, paving, grading & storm sewers for the extension of Fairgrounds Avenue
and June Street in Jerseyville. 65 Working Days. Thiems Construction Co., Inc.,
Edwardsville, $1,044,761.
66. Kane County, IL 38, District 1, Contract No. 62499, Crack and joint
routing and sealing along IL 38 from Randall Road to IL 47 in Elburn and St.
Charles. 15 Working Days. Kenneth R. Hartman, Inc., Kankakee, $54,400.
67. Kane County, IL 64, District 1, Contract No. 62500, Crack and joint
routing and sealing along IL 64 from IL 47 to the DeKalb County line in Virgil
and Lily Lake. 15 Working Days. Freehill Asphalt, Inc., Watseka, $78.756.
68. Livingston County, IL 47, District 3, Contract No. 66307, regrading
roadside ditches and collateral drainage improvements along 1,568 ft of IL 47
just north of the intersection with IL 116 near Saunemin. 15 Working Days.
Tobey's Construction & Cartage, Inc., Herscher, $58,609.
69. Peoria County, US 24, District 4, Contract No. 68314, Landscaping
consisting of tree and shrub planting to create a natural sight screen on US 24
east of the I-474 interchange north of Bartonville. Completion Date October 31,
2005 Plus 10 Working Days. Krumholz Brothers Landscaping, Peoria, $114,894.
70. Peoria County, IL 29, District 4, Contract No. 68328, Demolition of a
house located at 1315 N. 4th Street in Chillicothe. 15 Working Days. River City
Demolition, Peoria, $10,125.
71. Peoria-Tazewell Counties, I-74, District 4, Contract No. 68308, Placement
of temporary informational signing along various routes (including detour I-474)
for the reconstruction of I-74 in Peoria and East Peoria. Completion Date
November 30, 2006. T.M.F. Construction Co., Springfield, $494,906.
72. Pike County, IL 100, District 6, Contract No. 72699, 0.06 mile of the
installation of new guardrail, terminals and riprap along IL 100 west of Pearl.
15 Working Days. McIntire & Co., Contractors, Winchester, $24,882.
73. Various Counties, Various routes, District 2, Contract No. 64861, Bridge
washing at various locations in Henry, Ogle, Putnam, Rock Island, Whiteside and
Winnebago counties. 30 Working Days. DeAngelo Brothers, Inc., Decatur, $123,998.
74. Various County, Various, District 7, Contract No. 94950, The cleaning and
painting of 7 bridges carrying various routes over I-70 and US 40 in Effingham
and Fayette Counties in District 7. 60 Working Days. A.G. Daglas Painting Co.,
Inc., Palos Heights, $414,000.
75. Various Counties, Various routes, District 7, Contract No. 94951,
cleaning and painting of 11 bridges on various routes in various counties in
District 7. 90 Working Days. Tom Crist Paint Co., Inc., Calumet City, $519,500.
76. Various Counties, I-57, District 5, Contract No. 70311, 48 miles of weed
control spraying on Interstate 57 in Coles, Cumberland, Douglas and Shelby
counties. Completion Date October 03, 2003. DeAngelo Brothers, Inc., Decatur,
$31,644.
77. Will County, Various routes, District 1, Contract No. 62498, Crack and
joint routing and sealing along various routes in Will County. 15 Working Days.
Freehill Asphalt, Inc., Watseka, $102,486.
78. Winnebago County, I-90, District 2, Contract No. 64878, Routing, cleaning
and sealing pavement surface cracks on Interstate 90 from Rockton Road to the
Wisconsin State line. 15 Working Days. SKC Construction, Inc., Elgin, $117,981.
79. Champaign County, US 45/Century Blvd. District 5, Contract No. 70056,
2.19 km of bituminous concrete resurfacing and traffic signals on US 45/Century
Blvd from US 136 to 0.8 miles south in Rantoul. Completion Date December 01,
2003 Plus 10 Working Days. Beniach Construction Co., Inc., Hindsboro,
$3,747,747.
80. Gallatin-Saline Counties, IL 13, District 9, Contract No. 98754, 17.58
miles of pavement patching, bituminous surface removal, bituminous concrete
resurfacing, 10 ft and 4 ft width bituminous shoulders, 6 ft and 2 ft width
aggregate shoulders, bridge repairs and bridge deck microsilica concrete
overlays on four bridges on IL 13 between Harrisburg and Old Shawneetown. 115
Working Days. E.T. Simonds Construction Co., Carbondale, $5,272,216.
81. Henry County, US 34, District 2, Contract No. 64507, Improvement of the
intersection at US 34 and Kentville Road by the addition of an auxiliary lane
and left turn lanes, east of Kewanee. Completion Date August 22, 2003. Bob
Propheter Construction, LLC, Sterling, $2,172,505.
82. JoDaviess County, US 20, District 2, Contract No. 64610, construction of
turn lanes at US 20 and Barge Terminal Road east of East Dubuque. 40 Working
Days. Civil Constructors, Inc. of Illinois, Freeport, $546,918.
83. Lake County, IL 21, District 1, Contract No. 62442, 2.77 miles of milling
and bituminous concrete surface on IL 21 from IL 176 (East Park Avenue) to IL 60
(Townline Road) in Libertyville. Completion Date October 31, 2003 Plus 05
Working Days. Curran Contracting Co., Crystal Lake, $824,472.
84. Lake County, Washington Street, District 1, Contract No. 83537, 2.85 km
of additional lanes, widening, resurfacing, drainage system, traffic signals
along Washington Street from U.S. 45 to Hunt Club Road. 215 Working Days. Berger
Excavating Contractors, Inc., Wauconda, $7,339,397.
85. Livingston County, IL 116, District 3, Contract No. 66237, 1.75 miles of
bituminous concrete widening and resurfacing of IL 116 from IL 23 to the east
city limits of Pontiac. Completion Date November 30, 2003 Plus 25 Working Days.
T&T Cartage, Inc. & Tobey's Construction & Cartage, Inc., Herscher, $2,482,255.
86. Madison County, US 67/IL 111, District 8, Contract No. 76099, 1.90 miles
of pavement patching, bituminous surface removal, widening and resurfacing,
storm sewers, curb and gutter, and signal work to provide a bi-directional turn
lane and bicycle accommodations along US 67/IL 111 in Godfrey from Tolle Lane to
the US 267 wye. 95 Working Days. The Killian Corp. & Asphalt Sales and Products,
Inc., Mascoutah, $3,497,840.
87. Madison County, IL 255, District 8, Contract No. 76544, 0.89 kilometer of
pavement patching, widening and resurfacing, channelized medians, bituminous &
aggregate shoulders, and the installation of traffic signals on Fosterburg Rd.
at the interchange with IL 255. Completion Date August 31, 2003. The Kilian
Corp. & Asphalt Sales and Products, Inc., Mascoutah, $1,116,724.
88. McLean County, OR 51, District 3, Contract No. 66316, bituminous shoulder
removal and replacement and guardrail removal and replacement at 7 culvert
locations on OR 51 between Heyworth and Randolph. 50 Working Days. Rowe
Construction Co., Bloomington, $264,371.
89. Sangamon County, Dirksen Parkway, District 6, Contract No. 92822, 4.46 km
of reconstruction on Dirksen Parkway between Ridge Avenue and Peoria Road on the
east side of Springfield. Consisting of pavement patching, widening and
resurfacing the existing pavement to provide two through lanes in each direction
and a bi-directional turn lane, traffic signals, curb and gutter and storm
sewers. The intersections of Sangamon Avenue, Northfield Drive, Atlanta Street,
Walton Drive, Sam's Place and Mayden/Bissel Drive will be reconstructed. Also,
included is the removal of the existing railroad subway north of the
Mayden/Bissel Drive intersection Completion Date October 31, 2004. Truman L.
Flatt & Sons Co., Inc., Springfield, $6,938,422.
90. Cook County, Torrence Avenue, District 1, Contract No. 62033, Removal and
replacement of the bridge deck and approach slabs, widening of the pier caps and
abutments and lighting on the 9-span structure carrying Torrence Avenue over
Conrail, Baltimore & Ohio, Chicago Terminal and Indiana Harbor Belt Railroad, in
Burnham. Completion Date September 30, 2003 Plus 10 Working Days. Lorig
Consruction Co., Des Plaines, $2,574,662.
91. Cook County, Joliet Road, District 1, Contract No. 62117, Bridge deck
replacement and new lighting on the structure carrying Joliet Road over B&O &
IHB Railroad in McCook. Completion Date October 31, 2003 Plus 10 Working Days.
Areatha Construction Co., Inc., Addison, $1,388,511.
92. Hancock, IL – Lee, IA Counties, US 136, District 6, Contract No. 72640,
Repairs to the bridge carrying US 136 over the Mississippi River at Hamilton.
Bridge joint repair, relocating the inspection catwalks underneath the
structure, removal and re-installation of the existing pedestrian handrail to
correct loose anchor studs, and riprap placement at pier 4. Completion Date:
August 1, 2003 Plus 20 Working Days. Halverson Constructon Co., Inc.,
Springfield, $969,198.
93. St. Clair County, Unmarked, District 8, Contract No. 76556, removal of
the 8 span MacArthur Bridge over northbound and southbound IL 3 near Sauget. 50
Working Days. Keeley & Sons, Inc., East St. Louis, $329,601.
94. Wabash County, CH 6, District 7, Contract No. 95355, Removal of the
existing structure carrying CH6 over Fordice Creek 4 miles north of Bellmont and
replacement with an 80 foot long triple span, precast, prestressed concrete deck
beam bridge with earth approaches and aggregate surface course. 40 Working Days.
Allendale Gravel Co., Inc., Allendale, $159,391.
95. Livingston County, IL 116, District 3, Contract No. 66312, Installation
of a traffic signal system on IL 116 at WalMart/Norman Drive and also at
Deerfield Road in Pontiac. 45 Working Days. Leo P. Kelly Electric, Inc.,
Pontiac, $313,896.
96. Ford County, I-57, District 3, Contract No. 66292, 0.10 miles of pavement
patching on Interstate 57 at milepost 262, 1.5 miles north of Paxton. 15 Working
Days. Iroquois Paving Corp., Watseka, $76,984.
97. Henry County, Unmarked Route, District 2, Contract No. 64483, Improvement
consists of paving the parking lots at Bishop Hill Historic site west of
Kewanee. 15 Working Days. Brandt Construction Co., Milan, $32,587.
98. JoDaviess County, US 20, District 2, Contract No. 64876, 10.1 miles of
pavement patching on US 20 between East Dubuque and IL 84. 15 Working Days.
Civil Constructors, Inc. of Illinios, Freeport, $190,892.
99. McLean-Livingston Counties, I-55, District 3, Contract No. 66336,
Cleaning and painting 4 structures in McLean and Livingston counties. 150
Working Days. Venus Painting Co., Lake Station, IN, $387,526.
100. McLean County, IL 9, District 3, Contract No. 66332, 10.7 miles of crack
and joint sealing on IL 9 from the Ford/McLean county line to Arrowsmith/Colfax
Road. 20 Working Days. Freehill Asphalt, Inc., Watseka, $53,044.
101. McLean County, Various, District 3, Contract No. 66329, Weed control
spraying on Interstates 74, 39 and 55 in McLean counties. Completion Date
September 28, 2003. DeAngelo Brothers, Inc., Decatur, $28,322.
102. Stephenson County, IL 26, District 2, Contract No. 64893, Replacement of
the topsoil and re-seeding areas along IL 26 near Fairview Road, north of
Freeport. 15 Working Days. Fischer Excavating, Inc., Freeport, $39,958.
103. Stephenson County, Various routes, District 2, Contract No. 64879,
Routing, cleaning and sealing pavement surface cracks on IL 73 from US 20 to the
Wisconsin State line, on US 20 BR from US 20 easterly to Freeport, and on US 20
from Freeport to Winnebago County, a combined distance of 21.36 miles. 15
Working Days. Freehill Asphalt, Inc., Watseka, $85,085.
104. Various Counties, Various routes, District 2, Contract No. 64881,
Routing and sealing of cracks on IL 251 from IL 72 to the Winnebago Ogle county
line; IL 251 from IL south to Roosevelt Road; and on US 20 from Interstate 90
east of Cherry Valley to Interstate 39. 15 Working Days. Fahrner Asphalt
Sealers, Inc., Plover, WI, $38,303.
105. Various Counties, Various routes, District 2, Contract No. 64863, "On
call" guardrail and fence repairs in the north one-half of District Two on all
state maintained routes. Completion Date March 15, 2004. G.F. Structures Corp.,
Chicago, $282,340.
106. Various Counties, Various routes, District 2, Contract No. 64862, "On
call" guardrail and fence repairs in the south one-half of District Two on all
state maintained routes. Completion Date March 15, 2004. G.F. Structures Corp.,
Chicago, $280,690.
107. Various Counties, Various routes, District 2, Contract No. 64883,
Applying herbicides along various routes in Bureau, Boone, Carroll, Henry, Lee,
Ogle, Putnam, Rock Island, Stephenson, Whiteside, Winnebago and JoDaviess
counties. Completion Date October 04, 2003. DeAngelo Brothers, Inc., Decatur,
$89,145.
108. Grundy-LaSalle Counties, Various, District 3, Contract No. 66328, Weed
control spraying on Interstate 39,80 and 55 in Grundy and LaSalle counties.
Completion Date May 31, 2003 Working Days. DeAngelo Brothers, Inc., Decatur,
$37,847.
109. Various County, Various, District 2 & 3, Contract No. 44806, Repairing
various width of thermoplastic, preformed plastic, preformed thermoplastic,
epoxy, hot spray thermoplastic and polyurea pavement marking lines on various
routes in District 2 and 3. Completion Date June 30, 2004. A.C. Pavement
Striping Co., Elgin, $470,035.
110. Various Counties, I-39, District 3, Contract No. 66289, Patching at 8
interchanges on Interstate 39 from Oglesby Spur in LaSalle County to US 24 in
Woodford County. 35 Working Days. Kovilic Construction Co., Inc., Franklin Park,
$151,461.
111. Winnebago County, IL 251, District 2, Contract No. 64877, 0.47 miles of
patching on the northbound ramps from IL 251 to Rockton Road. 15 Working Days.
Sjostrom & Sons, Inc., Rockford, $89,649.
112. Peoria County, IL 40, District 4, Contract No. 68112, 0.80 mile of
bituminous concrete resurfacing on IL 40 from Ravenswood Road to Lindberg Road
in Peoria. Also, bridge repairs to the structure carrying IL 40 over IL 6. 40
Working Days. R.A. Cullinan & Son, Inc., Tremont, $1,033,194.
113. Tazewell County, US 150, District 4, Contract No. 68151, 5.06 miles of
bituminous concrete resurfacing on US 150 from East Peoria to east of Detroit
Avenue in Morton. Completion Date July 02, 2003. R.A. Cullinan & Son, Inc.,
Tremont, $1,184,726.
114. Macoupin County, IL 4 & Old IL 4, District 6, Contract No. 72292, 5.27
km of pavement patching, bituminous surface removal, bituminous resurfacing,
bituminous concrete base course widening, and aggregate wedge shoulders on IL 4
from the Sangamon County Line to George Street in Virden; and on Old IL 4 from
south of Virden to IL 4 in Virden. Completion Date September 01, 2003. K.E. Vas
Co., Jacksonville, $1,887,245.
115. Clay-Richland Counties, US 50, District 7, Contract No. 94398, 7.43
miles of pavement patching, bituminous surface removal, bituminous concrete
resurfacing, 3 ft width bituminous shoulders and 5 ft width aggregate shoulders
on US 50 from west of Clay City to west of Noble. Also included is the
rehabilitation of the bridge over the Little Wabash River. 90 Working Days.
Howell Paving, Inc. & Wabash Asphalt Co., Inc., Mattoon, $2,387,681.
116. Williamson-Pope Counties, IL 37 & IL 146, District 9, Contract No.
98762, 1.34 miles of pavement patching, bituminous surface removal, bituminous
concrete resurfacing, 1.5 ft width bituminous shoulders an 2 ft width aggregate
shoulders at the following locations: (1) 1.01 miles on IL 37 at Pulleys Mill
and (2) 0.33 mile on IL 146 at Watersburg 30 Working Days. Southern Illinois
Asphalt Co., Inc., Marion, $413,288.
117. Cook County, Kedzie Avenue, District 1, Contract No. 60914, 0.94 mile of
milling and bituminous concrete surface on Kedzie Avenue from 71st Street to IL
7 and bridge rehabilitation on the structure carrying Kedzie Avenue over Belt
Railway Company Railroad all in Chicago. Completion Date November 30, 2003 Plus
25 Working Days. All Concrete Construction, Inc., Burr Ridge, $3,246,000.
118. Peoria-Tazewell Counties, I-74, District 4, Contract No. 68226,
Supplying an Intelligent Transportation System (ITS) on I-74 from west of
Sterling Avenue to east of Washington Street in Peoria and East Peoria.
Completion Date December 31, 2006. MasTec North America, Inc., Atlanta, GA,
$3,574,242.
119. Various Counties, Various routes, District 3, Contract No. 66298,
Miscellaneous pavement patching at various locations on various marked routes.
Completion Date December 31, 2003. G.M. Sipes Construction, Inc., Rushville,
$135,528.
120. Bond-Madison Counties, I-70 & I-55, District 8, Contract No. 76584, Spot
cleaning and painting the structures carrying TR 161 over I-70 at Smithboro; TR
156 over I-70, 7.9 miles east of Pocahontas; and TR 246 over I-55, 2 miles
northeast of Hamel. 65 Working Days. Icarus Industrial Painting & Contracting
Co., Inc., Valparaiso, IN, $171,000.
121. Cumberland-Douglas Counties, Various routes, District 5, Contract No.
90943, Scour protection at various locations in Cumberland and Douglas counties.
55 Working Days. A.J. Walker Construction Co., Mattoon, $268,787.
122. Jackson County, US-51, District 9, Contract No. 98784.
Landscaping along the backslopes of a relocated section of U.S.
Route 51 from Pleasant Hill Road to west of Boskydell Road in
Carbondale. Krajec Landscaping, West Salem, $120,795.
123. Sangamon County, I-55, District 6, Contract No.92911, 11.74 miles of
pavement patching, resurfacing, bituminous and aggregate should and the
rehabilitation of 11 structures along I-55 from south of Springfield to the
Montgomery County line. Illinois Valley Paving Co., Springfield, $17,470,330.
124. Pike County, I-72, District 6, Contract No. 72350, 29.46 miles of
bituminous surface removal, bituminous concrete resurfacing, bituminous
shoulders, guardrail removal and replacement, and bridge repairs on I-72 from
northwest of Kinderhook east to the Illinois River bridge. Completion date
November 1, 2003. No Bids Received.
1A. Illinois Valley Regional Airport, Peru, LaSalle County, Contract No.
IL025, Overlay & Mark Existing 6,000' X 100' Runway 18/36 & Taxiways. Johnson
Blacktop, Inc., Elburn, $1,028,053.
2A. WITHDRAWN.
3A. U OF I – Willard Airport, Savoy, Champaign County, Contract No. UN040,
Install 8' Class E Animal Control/Security Fence & Gates. Collins & Hermann,
Inc., St. Louis, MO, $711,711.
4A. WITHDRAWN.
5A. Peoria Regional Airport, Peoria, Peoria County, Contract No. PE079,
Relocate Runway 31 Glideslope; Relocate RVR; Relocate Runway 31 MALSR System;
Relocate Runway 13 Localizer; Remove Runway 31 Middle Marker; Remark Threshold
of Runway 13 Localizer. Laser Electric, Inc., Peoria, $606,965.
6A. WITHDRAWN
7A. WITHDRAWN,
8A. WITHDRAWN,
9A. WITHDRAWN
10A. WITHDRAWN
11A. WITHDRAWN
12A. WITHDRAWN,
13A. WITHDRAWN
14A. WITHDRAWN,
15A. St. Louis Regional Airport, East Alton, Madison County, Contract No.
SR080, The Reconstruction Of The Aircraft Parking Apron (Phase IV). Thiems
Construction Co., Inc., Edwardsville, $794,978.
16A. DeKalb-Taylor Municipal Airport, DeKalb, DeKalb County, Contract No.
DK047, Remove & Replace The Airfield Electrical Vault. Rockford Electric Power,
Inc., Loves Park, $381,892.
17A. Lewis University Airport, Romeoville, Will County, Contract No. LE031,
Pave, Light & Mark Runway 2/20 W/Turnaround & New Crossing Pavements. D.
Construction, Inc., Coal City, $5,257,285.
18A. Lewis University Airport, Romeoville, Will County, Contract No. LE032,
Pave, Light & Mark Partial Parallel Taxiway System For Runway 2/20. Sjostrom &
Sons, Inc., Rockford, $1,278,000.
19A. Decatur Airport, Decatur, Macon County, Contract No. DE162, Taxiway G
From Taxiway G-3 To Runway 12/30, Incl. Taxiway G-3. Beniach Construction Co.,
Inc., Hindsboro, $2,397,569.
20A. Decatur Airport, Decatur, Macon County, Contract No. DE262, Taxiway G-4
From Sta. 150+00 To Sta. 325+00. Beniach Construction Co., Inc., Hindsboro,
$263,727.
21A. Decatur Airport, Decatur, Macon County, Contract No. DE362, Taxiway G
From Sta. 334+59.81 To Sta. 353+86.78. Beniach Construction Co., Inc.,
Hindsboro, $1,452,053.
22A. Decatur Airport, Decatur, Macon County, Contract No. DE462, Taxiway G
From 319+00.05 To Sta. 334+59.81. Beniach Construction Co., Inc., Hindsboro,
$1,855,141.
23A. DeKalb-Taylor Municipal Airport, DeKalb, DeKalb County, Contract No.
DK148, Construction of a 2,225' X 100' Extension To Runway End 20. Rockford
Blacktop Construction Co., Loves Park, $2,616,092.
24A. DeKalb-Taylor Municipal Airport, DeKalb, DeKalb County, Contract No.
DK248, Construction of a 2,300' X 50' Extension To Taxiway "C". Rockford
Blacktop Construction Co., Loves Park, $838,723.
1LR. Menard County, Reclamation of Lincoln Coal Co. Mine Group, The proposed
reclamation project includes four abandoned mine sites located in Menard County.
The proposed work requires the removal of concrete caps exploratory excavation
(659 C.Y. Special Excavation) of settled fill mate in previously filled shafts.
The project also provides for the shafts to be filled and resealed with a
combination of soil furnished by the contractor (406 C.Y. of Borrow Excavation)
and crushed limestone fill materials (1,3 tons). The project also includes 0.8
acre of seeding, mulch, and soil. C.E. Clark & Son Contractors, Hettick,
$27,244.
###
|