Illinois Department of Transportation, Ann L. Schneider, Acting Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info


BDE Special Provisions
Bureau of Design & Environment  Special Provisions for use
For The August 3 and September 21, 2012 Letting

HOW TO USE PDF FILES: View a file: click the link with the left mouse button. Download a file: click the link with the right mouse button, then choose "save target as.

Name

Effective
Date
Revised
Date
August 3 and September 21, 2012 Check Sheet    
Above Grade Inlet Protection 07/01/09 01/01/12
Accessible Pedestrian Signals (APS)
04/01/03
01/01/07
Agreement to Plan Quantity 01/01/12  
Aggregate Subgrade Improvement 04/01/12 08/01/12
Automated Flagger Assistance Device 01/01/08  
Bituminous Materials Cost Adjustments 11/02/06 01/01/12
Bridge Demolition Debris 07/01/09  
Bridge Relief Joint Sealer 01/01/12 08/01/12
Building Removal – Case I (Non-Friable and Friable Asbestos)
09/01/90
04/01/10
Building Removal – Case II (Non-Friable Asbestos)
09/01/90
04/01/10
Building Removal – Case III (Friable Asbestos) 
09/01/90
04/01/10
Building Removal – Case IV (No Asbestos)
09/01/90
04/01/10
Calcium Chloride Accelerator for Class PP-2 Concrete 04/01/12  
Coarse Aggregate in Bridge Approach Slabs/Footings 04/01/12  
Completion Date (via calendar days) 04/01/08  
Completion Date (via calendar days) Plus Working Days 04/01/08  
Concrete Box Culverts with Skews > 30 Degrees and Design Fills ≤ 5 Feet 04/01/12  
Concrete Box Culverts with Skews ≤ 30 Degrees Regardless of Design Fill and Skews > 30 Degrees with Design Fills > 5 Feet 04/01/12  
Concrete Mix Design – Department Provided 01/01/12  
Construction Air Quality – Diesel Retrofit 07/01/10  
Construction Air Quality – Diesel Vehicle Emissions Control 04/01/09 01/02/12
Construction Air Quality – Idling Restrictions 04/01/09  
Digital Terrain Modeling for Earthwork Calculations 04/01/07  
Disadvantaged Business Enterprise Participation
09/01/00

08/02/11

Drainage and Inlet Protection Under Traffic 04/01/11 01/01/12
Errata for the 2012 Standard Specifications 04/01/12 08/01/12
Flagger at Side Roads and Entrances 04/01/09  
Friction Aggregate 01/01/11  
Fuel Cost Adjustment 04/01/09 07/07/09
High Tension Cable Median Barrier 01/01/07 04/01/09
Hot-Mix Asphalt – Density Testing of Longitudinal Joints 01/01/10 04/01/12
Impact Attenuators
11/01/03

01/01/12

Impact Attenuators, Temporary
11/01/03
01/01/12
Material Transfer Device
06/15/99
01/01/09
Metal Hardware Cast into Concrete 04/01/08 01/01/12
Modified Urethane Pavement Marking 04/01/12  
Moisture Cured Urethane Paint System

11/01/06

01/01/10
Movable Traffic Barrier System 01/01/10 01/01/12
Pavement Marking Removal 04/01/09  
Pavement Marking Tape Type IV 04/01/12
Pavement Patching 01/01/10
Payments to Subcontractors
06/01/00

01/01/06

Payrolls and Payroll Records 01/02/12  
Planting Woody Plants 01/01/12 08/01/12
Portland Cement Concrete 01/01/12  
Portland Cement Concrete Inlay or Overlay 04/01/12  
Portland Cement Concrete Sidewalk 01/01/12  
Preformed Plastic Pavement Marking Type D - Inlaid 04/01/12  
Preventive Maintenance – Bituminous Surface Treatment 01/01/09 04/01/12
Preventive Maintenance – Cape Seal 01/01/09 04/01/12
Preventive Maintenance – Micro-Surfacing 01/01/09 04/01/12
Preventive Maintenance – Slurry Seal 01/01/09 04/01/12
Quality Control/Quality Assurance of Concrete Mixtures 01/01/12
Railroad Protective Liability Insurance
12/01/86
01/01/06
Railroad Protective Liability Insurance (5 and 10)

01/01/06

 
Reclaimed Asphalt Pavement (RAP) 01/01/07 08/01/12
Reclaimed Asphalt Shingles (RAS) 01/01/12  
Removal and Disposal of Regulated Substances 01/01/12  
Restoring Bridge Approach Pavements Using High-Density Foam 01/01/09 01/01/12
Safety Edge 04/01/11  
Self-Consolidating Concrete For Cast-In-Place Construction
11/01/05
04/01/12
Self-Consolidating Concrete for Precast and Precast Prestressed Products
07/01/04

04/01/12

Shoulder Rumble Strips 01/01/12
Sidewalk, Corner or Crosswalk Closure 01/01/12  
Steel Cost Adjustment
04/02/04
04/01/09
Stone Matrix Asphalt 01/01/10 01/01/12
Subcontractor Mobilization Payments

04/02/05

04/01/11
Surface Testing of Pavements
04/01/02

01/01/07

Temporary Erosion and Sediment Control 01/01/12  
Temporary Raised Pavement Marker 01/01/09  
Temporary Water Filled Barrier 01/01/10 01/01/12
Tracking the Use of Pesticides 08/01/12  
Type G Inlet Box 01/01/12  
Traffic Control Deficiency Deduction 08/01/11  
Training Special Provisions
10/15/75
 
Utility Coordination and Conflicts 04/01/11 01/01/12
Warm Mix Asphalt 01/01/12  
Wet Reflective Thermoplastic Pavement Marking 01/01/12  
Working Days
01/01/02
 
Download all Special Provisions (.pdf file)(1.1 mb)

Technical Support: 217-524-1642 null

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA