IDOT Home IDOT Home

IDOT Home

Rod R. Blagojevich, Governor
90/94 On the Move to Improve
 Home
 Project Information
 Calendar of Events
 Environmental  Action
 News
 Resources
 Project Scrapbook
 Traffic Info
 Contracting & Jobs
 Supportive Services  Program
 Contact Us
 Contents
 Search

 IDOT Homepage
 Kingery Const. Site
 Borman Const. Site
 CDOT
 CTA
 Illinois Tollway
 PACE
 Metra
 Share the Drive
 Illinois Roads
 Secretary of State

[Search Tips]

   Features   

diagonal image

Overview


Each day hundreds of thousands of people travel the Dan Ryan Expressway, the city's major transportation artery from downtown Chicago through the heart of the city's South Side. The Dan Ryan is currently the busiest expressway in the Chicago area and also has the highest accident rate. Committed to the safety of the traveling public, the Illinois Department of Transportation will be reconstruction the Dan Ryan Expressway beginning in 2004 and continuing through 2007.

Facts about the Dan Ryan:

  • First designed and built from 1961-1963.

  • In 1963, each day just over 150,000 vehicles traveled on this roadway.

  • Today traffic has more than doubled to 300,000 vehicles traveling the expressway daily

  • From 1998-2000, over 8,200 accidents occurred, causing 27 deaths and 1800 injuries.

  • After 40 years, the road has surpassed its intended design life by more than 20 years.

The Need for Reconstruction:

  • To reduce accident rates

  • To relieve congestion

  • To rebuild deteriorating pavement

  • To eliminate flooding

  • To improve Skyway interchange

Benefits to the Local Community:

  • Reconstruction of local access roads between 47th & 63rd Streets

  • Synchronized timing of traffic lights

  • Addition of designated turn lanes at 55th and 67th

  • Improved curb design on local access roads

  • Improved pedestrian accommodations surrounding CTA stations

  • Beautify local access road with landscaping

Major Improvements to the Dan Ryan:

  • State-of-the-art design will greatly improve travel safety, eliminate traffic bottlenecks and reduce congestion.

  • All lanes of traffic will be completely reconstructed for improved travel conditions from 31st Street south to I-57.

  • Additional local lane in each direction from 47th - 63rd.

  • Additional lane in each direction from 67th - 95th.

  • Full interchange created at 47th Street by adding northbound exit to 47th street and southbound entrance from 47th.

  • Additional updated highway lighting and overhead message signs.

  • Enhanced sewers to correct drainage problems and reduce flooding on the expressway.

  • Ramps reconfigured to improve traffic merges and reduce weaving in traffic, both major causes of accidents on the roadway.

  • Higher barrier walls along the CTA to prevent cars from going on to the tracks.



Site Map | IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility | Contact Us