2006 CONSTRUCTION MANUAL
DOCUMENTATION OF
CONTRACT QUANTITIES
Table of Contents
*Asterisks next to the links indicate
that the file has been updated and is posted on the
Addendum page.
Section A – General
Requirements*
Use of ICORS for Documentation
Project Diary
The Quantity Book
Field Inspection Reports/Source Documentation
Field Books
Initials and Dates
Plan Quantity Acceptance
Progress Documentation
Items That Must Be Final Measured
Use of Computers for Final Documentation
Extra Work (Article 109.04)
Materials Allowance
Maximum Payment
Yield Checks
Thickness Determination Schedule
Documentation Procedures for Construction Engineering
Performed by Consultants
Documentation of Pay Quantities Based on Weight Tickets
Documentation of Roller Weights
Final Documentation
Section B – Final
Documentation Requirements by Pay Unit *
Section C – Final
Documentation Requirements by Pay Item *
Section D – Reference
Tables
* Estimating Daily Earth Volumes with Load Counts Maximum Legal Load Limits for Trucks, Form BT 753
Section E – Trench
Backfill Tables*
Trench Backfill Table for Circular Concrete Pipes, Metric
Trench Backfill Table for Elliptical Pipes, Metric
Trench Backfill Table for Arch Pipes, Metric
Trench Backfill Table for Circular Concrete Pipes, English
Trench Backfill Table for Elliptical Pipes, English
Trench Backfill Table for Arch Pipes, English
Section F
– Documentation Examples*
Construction Manual Addendum Page
|