|
MEMO |
SUBJECT |
EFFECTIVE
DATE |
| |
|
|
|
Index |
Index of Construction Memorandums |
08/16/12 |
|
1 |
Purpose of Construction Memorandums, Index and Extension of
Expiration Dates |
11/24/03 |
|
2 |
Construction Projects Incorporating Experimental Features |
05/01/02 |
|
3 |
Specification Changes for Projects Under Contract |
01/03/95 |
|
4 |
Authorization of Contract Changes |
04/01/13 |
|
5 |
Project Acceleration |
04/01/99 |
|
6 |
Procedures for Local Agency Contracts Exempt From Federal Oversight |
01/01/12 |
|
7 |
County and Township Roads Used as Haul Roads - Section 107 |
04/26/02 |
|
8 |
Independent Weight Checks and Scale Checks |
10/01/00 |
|
9 |
Force Account Billing – Article 109.04 |
01/01/08 |
|
10 |
Vibratory Rollers Approved for Use in Illinois Article - 1101.01(g) |
04/01/06 |
|
11 |
Hot Mix Asphalt (HMA) Spreading and Finishing Machines Approved for
Use in Illinois – Article 1102.03 |
01/01/08 |
|
14 |
Labor Compliance - Federal-Aid Highway Projects |
03/06/09 |
|
22 |
Procedures for Applying the Bituminous Materials Cost Adjustment
|
03/01/09 |
|
24 |
Equal Employment Opportunity Contract Provisions and District
Responsibilities |
03/01/06 |
|
28 |
Administration of Contract Time - Articles 108.03, 108.04, 108.05
and 108.08 |
03/01/09 |
|
30 |
Policies and Procedures for Approval of Subcontractors |
04/26/12 |
|
33 |
Operational Review of Contract Quantities |
05/01/12 |
|
39 |
Transportation or Operation of Heavy Equipment on Pavement or
Bridges Within the Contract Limits - Article 107.16 |
04/01/06 |
|
40 |
Rubblizing PCC Pavement and Placing a Bituminous Concrete Overlay |
06/01/01 |
|
43 |
Coring Policy for Thickness Determination – Sections 353, 354, 355,
356, 407, 420, 421, 482 and 483 |
01/01/09 |
|
46 |
Field Control of Railroad and Utility Adjustments |
06/04/02 |
|
53 |
Surface Testing of Pavements - California Type Profilograph |
01/01/08 |
|
55 |
Placement of Hot Mix Asphalt – Article 406.06 |
01/01/08 |
|
57 |
Plan Preparation and Field Location of Utilities |
05/31/02 |
|
59 |
Resurfacing of D-Cracked CRC Pavements |
01/03/95 |
|
60 |
Erosion and Sediment Control |
05/01/06 |
|
61 |
Guidelines for the Negotiation and Administration of Consultant
Contracts for Construction Engineering Services |
08/15/03 |
|
63 |
Construction Safety |
01/03/95 |
|
64 |
Sequential Deck Pours |
05/15/07 |
|
70 |
Preconstruction Conference Guidelines |
08/15/03 |
|
71 |
Guidelines for Review of Contract Claims |
05/31/02 |
|
72 |
Structural Steel Damaged During Deck Removal |
05/15/07 |
|
73 |
Guidelines for the Use of a Vibratory Screed to Finish Bridge Decks
- Article 503.16(a)(1) |
11/22/10 |
|
74 |
Guidelines for Pumping of Bridge Deck Concrete |
04/01/13 |
|
75 |
PCC Patching - Opening Road to Traffic |
01/01/08 |
|
76 |
Contractor Payments - Articles 109.07 & 109.08 |
04/01/06 |
|
77 |
Winter Shutdown Procedures |
11/15/01 |
|
78 |
Bridge Deck Patching |
05/31/02 |
|
79 |
Contract Closeouts |
05/01/12 |
|
80 |
Interest for Late Payments |
01/01/12 |
|
81 |
District Construction Project File Requirements |
06/01/12 |
|
Index and All Current
Memorandums 3.0 MB |
08/16/12 |