| Memo |
Subject |
Issued |
Status * |
|
Index |
Index of Construction Memorandums |
4/06 |
A |
|
1 |
Purpose of
Construction Memorandums, Index and Extension of Expiration Dates |
4/1/02 |
A |
|
2 |
Construction Projects
Incorporating Experimental Features |
5/1/02 |
A |
|
3 |
Specification
Changes for Projects Under Contract |
1/3/95 |
A |
|
4* |
Contract Changes -
Articles 104.02 and 109.04 |
5/1/06 |
A |
|
5 |
Project
Acceleration |
4/1/99 |
A |
|
6 |
Federal-aid
Secondary and Certification Acceptance Procedures and Local Agency
Projects |
5/31/02 |
A |
|
7 |
County and
Township Roads Used as Haul Roads - Section 107 |
4/26/02 |
A |
|
8 |
Independent Weight
Checks |
10/1/00 |
A |
| 9* |
Force Account Billing (NEW!) |
5/15/07 |
A |
|
10 |
Vibratory Rollers
Approved for Use in Illinois Article 1101.01(g) |
4/1/06 |
A |
|
11* |
Bituminous Spreading
and Finishing Machines Approved for Use in Illinois - Article
1102.03 |
4/1/06 |
A |
|
|
Labor Compliance
- Federal-Aid Highway Projects |
4/28/03 |
A |
| 15 |
Welding of
Construction Accessories to Structural Steel Bridges Members -
Section 505 |
1/3/95
|
I |
| 22 |
Procedures for Applying the Bituminous
Materials Cost Adjustment (NEW) |
|
|
|
24 |
Equal Employment
Opportunity Contract Provisions and District
Responsibilities |
5/1/06 |
A |
|
28* |
Administration of
Contract Time for Working Day Contracts - Articles 108.03, 108.04
and 108.08 |
5/31/02 |
A |
|
30 |
Policies and
Procedures for Approval of Subcontractors |
5/1/00 |
A |
|
33 |
Operational Review
of Contract Quantities |
8/1/97 |
A |
|
39 |
Transportation or Operation of Heavy Equipment on
Pavement or Bridges Within the Contract Limits - Article
107.16 |
4/1/06 |
A |
|
40 |
Rubblizing PCC
Pavement and Placing a Bituminous Concrete Overlay |
6/1/01 |
A |
|
42 |
Contractor Coring of Pavement |
8/1/05 |
A |
|
43* |
Coring Policy for
Thickness Determination |
9/3/01 |
A |
| 44 |
Pile Splices |
5/5/00 |
I |
| 45 |
Type III
High-Early-Strength Portland Cement Concrete Mixture |
5/31/02 |
I |
|
46 |
Field Control of
Railroad and Utility Adjustments |
6/4/02 |
A |
| 51 |
Delay Starting Work - Article
108.03 |
1/1/82 |
I |
| 53* |
Articles 407.09
and 420.12 - California Type Profilograph |
1/3/95 |
A |
|
55* |
Placement of Bituminous Mixtures
- Article 406.15 |
5/31/02 |
A |
| 57 |
Plan Preparation
and Field Location of Utilities |
5/31/02 |
A |
|
59 |
Resurfacing of D-Cracked CRC
Pavements |
1/3/95 |
A |
| 60 |
Erosion Control |
5/1/06 |
A |
|
61 |
Guidelines for the
Negotiation and Administration of Consultant Contracts
for Construction Engineering Services |
8/15/03 |
A |
| 63 |
Construction
Safety |
1/3/95 |
A |
|
64* |
Sequential Deck Pours |
1/3/95 |
A |
| 67 |
Earthwork
Quantities for Separate Grading and Paving Contracts |
5/31/02 |
A |
| 68* |
Borrow, Use and Waste Site, And Excess Material Disposition Documentation, Review and Approval (NEW)(formerly Trees) |
1/01/08 |
A |
|
70 |
Preconstruction Conference Guidelines |
8/15/03 |
A |
|
71 |
Guidelines for Review of
Contract Claims |
5/31/02 |
A |
| 72* |
Structural Steel
Damaged During Deck Removal |
1/3/95 |
A |
|
73* |
Guidelines for the Use of a
Vibratory Screed to Finish Bridge Decks - Article 503.17(c) |
5/31/02 |
A |
| 74* |
Guidelines for
Pumping of Bridge Deck Concrete |
4/12/00 |
A |
|
75* |
Special Concrete Patching
Mixture - Opening Road to Traffic |
5/1/98 |
A |
| 76 |
Contractor
Payments - Articles 109.07 & 109.08 |
4/1/06 |
A |
|
77 |
Winter Shutdown Procedures |
11/15/01 |
A |
| 78 |
Bridge Deck
Patching |
5/31/02 |
A |
| 79* |
Contract Closeouts (NEW!) |
1/2/07 |
A |
|
1/12/04 |
5.07 MB |
"A" Indicates Active Status,
"I" indicates Inactive Status |
|
|