|
Number
|
Date Issued |
Title
|
|
CL 2013-07 |
05/06/2013 |
FY 2014 Local Rail / Highway Grade Crossing Safety
Program |
|
CL 2013-06 |
05/01/2013 |
Surface Transportation Program (STP) - Bridge Program;
STP - Off System Bridge Program |
|
CL 2013-05 |
03/26/2013 |
Township Bridge Lapse Pool Program |
|
CL 2013-04 |
03/11/2013 |
Schedule of Average Annual Equipment Ownership Expense
Index |
|
CL
2013-03 |
02/01/2013 |
FY 2014 Highway Safety Improvement Program |
|
CL
2013-02 (revised) |
01/24/2013 |
FY 2014 Allotments to the Counties: STP-Rural,
SMA, STP-Bridge |
|
CL 2013-02 |
01/16/2013 |
FY 2014 Revised Allotments to the Counties: STP-Rural,
SMA, STP-Bridge |
|
CL 2013-01 |
01/02/2013 |
IDOT Program Manager Assignments |
|
CL 2012-22 |
12/21/2012 |
PA097-0964 Prevailing Wage Rate Revision Notification |
|
CL 2012-21 |
12/20/2012 |
Control of Outdoor Advertising Signs Along State Highways |
|
CL 2012-20 |
12/18/2012 |
Railroad Protective Liability Insurance |
|
CL 2012-19 |
11/26/2012 |
Form for Resolution of Township Indebtedness |
|
CL 2012-18 |
09/17/2012 |
Bridge Scour Monitoring System |
|
CL 2012-17 |
08/20/2012 |
Updated NBIS Bridge Inspection Forms |
CL 2012-16
(revised) |
11/02/2012 |
Major Bridge Program |
|
CL 2012-15 |
08/07/2012 |
Illinois Department of Transportation Retirements and
Personnel Changes |
|
CL 2012-14 |
07/27/2012 |
Township Bridge Program |
|
CL 2012-13 |
07/05/2012 |
23 NBIS Metrics Update |
|
CL 2012-12 |
06/25/2012 |
FY 2012 Rock Salt Material Contracts |
|
CL 2012-11 |
08/21/2012 |
FY 2014 Truck Access Route Program |
|
CL 2012-10 |
04/16/2012 |
Design Requirements for Simple Span Cast-In-Place
Concrete Box Culverts on Non-Federal Aid Projects |
|
CL 2012-09 |
04/16/2012 |
Name Signs |
|
CL 2012-08 |
02/29/2012 |
23 NBIS Metrics |
|
CL 2012-07 |
02/21/2012 |
Schedule of Average Annual Equipment Ownership Expense Index |
|
CL 2012-06 |
02/21/2012 |
Illinois State Bikeway Plan – Request for Information |
|
CL 2012-05 |
02/21/2012 |
LRFD Design Requirements for Precast and Cast-in-Place Concrete Box Culverts |
|
CL 2012-04 |
01/27/2012 |
Interim Approval – Electric Vehicle Charging Symbol (Alternate) Sign |
|
CL 2012-03 |
01/25/2012 |
Status of MUTCD Compliance Date Rulemaking |
|
CL 2012-02 |
01/23/2012 |
FY 2013 Highway Safety Improvement Program and High Risk
Rural Roads Program |
|
CL 2012-01
(revised) |
11/29/2012 |
FY 2013 Revised Allotments to the Counties: STP-Rural,
SMA, STP-Bridge |
|
CL 2011-19 |
12/19/2011 |
Local Rail/Highway Grade Crossing Safety Program |
|
CL 2011-18 |
11/22/2011 |
Interim Approval - Optional Use of Colored Pavement for Bike Lanes in Illinois |
|
CL 2011-17 |
10/31/2011 |
FHWA Technical
Advisory 5140.32 – AASHTO M270 GR. 100 Steel |
|
CL 2011-16 |
10/24/2011 |
Structure Information and Procedure (SIP) Manual Revisions |
|
CL 2011-15 |
09/30/2011 |
FY2013 Truck Access Route Program (TARP) |
|
CL 2011-14 |
09/13/2011 |
Notice of Proposed Amendment for MUTCD Compliance Dates |
|
CL 2011-13 |
09/08/2011 |
Township Bridge Program |
|
CL 2011-12 |
08/22/2011 |
Fraud Notice |
|
CL 2011-11 |
08/08/2011 |
Precast Concrete Bridge Slabs |
|
CL 2011-10 |
08/01/2011 |
Major Bridge Program |
|
CL 2011-09 |
06/24/2011 |
Local Government Component of Illinois Jobs Now! |
|
CL 2011-08 |
06/22/2011 |
Children Warning Signs |
|
CL 2011-07 |
06/22/2011 |
Accessible Parking Space Striping |
|
CL 2011-06 |
05/24/2011 |
Pile Design and Construction Changes - Revised |
|
CL 2011-05 |
03/31/2011 |
Geosynthetic Reinforced Soil - Integrated Bridge System |
|
CL 2011-04 |
03/28/2011 |
Illinois Supplement to the 2009 MUTCD |
|
CL 2011-03 |
03/24/2011 |
Schedule of
average annual equipment ownership expense index |
|
CL 2011-02 |
01/20/2011 |
FY 2012 Highway Safety Improvement Program and High Risk
Rural Roads Program |
CL 2011-01
(revised) |
01/21/2011 |
FY 2012 Allotments to the Counties:
- Surface Transportation Program Rural (STR)
- State Matching Assistance (SMA)
- Highway Bridge Program (HBP) |
|
CL 2010-15 |
12/16/2010 |
Road, Bridge and other Related Laws of Illinois - 2010
Edition |
|
CL 2010-14 |
12/16/2010 |
Pile Design and Construction Changes |
|
CL 2010-13 |
12/08/2010 |
2009 MUTCD Compliance Date Rulemaking |
|
CL 2010-12 |
10/13/2010 |
FY 2012 Local Rail/Highway Grade Crossing Safety Program |
|
CL 2010-11 |
10/01/2010 |
FY 2012 Truck Access Route Program (TARP) - Increased
Project Participation Limits |
|
CL 2010-10 |
09/27/2010 |
Local Government Component of Illinois Jobs Now! |
|
CL 2010-09 |
09/07/2010 |
Bridges with Gusset Plates, Fracture Critical Members or Hoan Details |
|
CL 2010-08 |
08/19/2010 |
Township Bridge Program |
|
CL 2010-07 |
08/16/2010 |
Resident Engineer / Technician for Federal Aid Projects |
|
CL 2010-06 |
07/27/2010 |
Major Bridge Program |
|
CL 2010-05 |
07/16/2010 |
Employment of Illinois Workers During Periods of
Excessive Unemployment |
|
CL 2010-04 |
06/11/2010 |
Consultant Prequalification Requirements for Federal
Work |
|
CL 2010-03 |
05/26/2010 |
Sign Retroreflectivity Assessment / Management Method |
|
CL 2010-02 |
02/26/2010 |
Schedule of Average Annual Equipment Ownership Expense
Index |
|
CL 2010-01 |
01/12/2010 |
Special Waste |
|
CL 2009-20 |
12/29/2009 |
Freshwater Mussels |
|
CL 2009-19 |
12/23/2009 |
FY 2011 Allotments to the Counties
- Surface Transportation Program Rural (STR)
- State Matching assistance (SMA)
- Highway Bridge Program (HBP) |
|
CL 2009-18 |
12/22/2009 |
FY 2011 Highway Safety Improvement Program and High Risk
Rural Roads Program |
|
CL 2009-17 |
12/04/2009 |
Design of Roadway Approaches at Railroad/Highway
Crossings |
|
CL 2009-16 |
11/24/2009 |
FY 2011 Local Rail/Highway Grade Crossing Safety Program |
|
CL2009-15 |
11/06/2009 |
High Visibility Apparel |
|
CL2009-14 |
10/02/2009 |
FY 2011 Truck Access Route Program (TARP) |
|
CL2009-13 |
09/24/2009 |
Bridge Posting with 80,000 Pound Legal Loads |
|
CL2009-12 |
08/24/2009 |
Township Bridge Program |
|
CL2009-11 |
07/09/2009 |
Major Bridge Program |
|
CL2009-10 |
05/27/2009 |
Bridges with Timber Substructures |
|
CL2009-09 |
05/21/2009 |
Warm Mix Asphalt Experimental Features |
|
CL2009-08 |
03/31/2009 |
Illinois Department of Transportation (IDOT) Forms |
|
CL2009-07 |
03/31/2009 |
Bridge Scour Supplement |
|
CL2009-06 |
03/16/2009 |
Beneficial Use of Bridge Demolition Debris |
|
CL2009-05 |
03/09/2009 |
American Recovery and Reinvestment Act (ARRA) of 2009 |
|
CL2009-04 |
02/27/2009 |
Schedule of Average Annual Equipment Ownership Expense
Index |
|
CL2009-03 |
02/25/2009 |
American Recovery and
Reinvestment Act (ARRA) of 2009 |
|
CL2009-02 |
01/15/2009 |
FY 2010 Allotments of
Surface Transportation Program Rural (STR), State
Matching Assistance and Highway Bridge Program (HBP)
Funds to the Counties |
|
CL2009-01 |
01/09/2009 |
Snow Removal Near Railroad
Crossings |
|
CL2008-17 |
12/22/2008 |
FY 2010 Highway Safety
Improvement Program and High Risk Rural Roads Program |
|
CL2008-16 |
12/15/2008 |
Inspection and Coring of Reinforced Concrete Structures |
|
CL2008-15 |
12/04/2008 |
2008 Road, Bridge and Other
Related Laws of Illinois |
|
CL2008-14 |
11/12/2008 |
Pipe Culverts and Storm
Sewers |
|
CL2008-13 |
11/10/2008 |
Snow and Ice Removal on
State Highways |
|
CL2008-12 |
08/26/2008 |
Major Bridge Program |
|
CL2008-11 |
08/18/2008 |
FY2010 Local Rail / Highway
Grade Crossing Safety Program |
|
CL2008-10 |
08/11/2008 |
Township Bridge Program |
|
CL2008-09 |
07/11/2008 |
FY2010 Truck Access Route
Program (TARP) |
|
CL2008-08 |
06/02/2008 |
Schedule of Average Annual Equipment Ownership Expense Index |
|
CL2008-07 |
05/27/2008 |
Manual on Uniform Traffic Control Devices (MUTCD) Compliance |
|
CL2008-06 |
05/20/2008 |
Manual for Fabrication of Precast Prestressed Concrete Products |
|
CL2008-05 |
05/15/2008 |
2004 Regression Equations/Streamstats |
|
CL2008-04 |
05/15/2008 |
Pile Load Conversions for New IDOT Driving Specifications |
|
CL2008-03 |
04/23/2008 |
Standard Bridge Plan Retirement |
|
CL2008-02 |
03/07/2008 |
FHWA 2008 Excellence in Highway Design Awards |
|
CL2008-01 |
01/29/2008 |
Illinois State Transportation Plan 2007 |
|
CL2007-23 |
12/31/2007 |
Substance Abuse Prevention
Program |
|
CL2007-22 |
12/20/2007 |
FY09 Allotments of STR, State Matching Assistance and HBP Funds to the Counties |
|
CL2007-21 |
12/03/2007 |
Scour Critical Bridges -
Plan of Action Update |
|
CL2007-20 |
12/03/2007 |
PPC Deck Beam - New Shape
Implementation, Standard Bridge Plan Retirement, and PPC
Deck Beam Inspection |
|
CL2007-19 |
11/19/2007 |
NBIS Personnel
Qualifications |
|
CL2007-18 |
11/05/2007 |
2009 Highway Safety
Improvements Program and High Risk Rural Roads Program |
|
CL2007-17 |
10/23/2007 |
NPDES Permits for Local
Projects on the Sate Letting |
|
CL2007-16 |
09/19/2007 |
Major Bridge Program |
|
CL2007-15 |
08/29/2007 |
Township Bridge Program |
|
CL2007-14 |
08/30/2007 |
Immediate Inspection of Deck
Truss Bridges Containing Fracture Critical Members (FCM)
(FHWA TECHNICAL ADVISORY 5140.27) |
|
CL2007-13 |
08/14/2007 |
Construction Loads on
Bridges (FHWA TECHNICAL ADVISORY 5140.28) |
|
CL2007-12 |
08/14/2007 |
Eberle Design, Inc., Recall
of Conflict Monitors / Malfunction Management Units |
|
CL2007-11 |
08/10/2007 |
Electronic Environmental
Survey Request Submittal |
|
CL2007-10 |
08/06/2007 |
Structure Information and
Procedure (SIP) Manual Revisions |
|
CL2007-09 |
07/02/2007 |
Eligible Funds for Bridge
Inspections and Bridge Inspection Training |
|
CL2007-08 |
06/06/2007 |
Safe Routes to School
Program (SRTS) |
|
CL2007-07 |
06/05/2007 |
Force Account Billing for
Local Projects on the State Letting |
|
CL2007-06 |
04/27/2007 |
LRFD Design Implementation |
|
CL2007-05 |
03/22/2007 |
Scour Critical Bridges and
Plans of Action |
|
CL2007-04 |
03/22/2007 |
Local Crash Data Collection
Program |
|
CL2007-03 |
03/19/2007 |
Local Agency Federal
Flexible Match Program |
|
CL2007-02 |
02/08/2007 |
2008 Highway Safety
Improvement Program and High Risk Rural Roads Program |
|
CL2007-01 |
01/18/2007 |
Township Bridge Lapse Pool
Program |
|
CL2006-15 |
12/20/2006 |
Allocation of Surface
Transportation Program Rural (STR), state matching
assistance and Highway Bridge Program (HBP) funds to the
counties |
|
CL2006-14 |
12/06/2006 |
2006 Road, Bridge and other
related laws of Illinois |
|
CL2006-13 |
12/06/2006 |
Certified Apprenticeship and
Training Program |
|
CL2006-12 |
11/15/2006 |
Average Annual Equipment
Ownership Expense Database |
|
CL2006-11 |
10/10/2006 |
2007 Special Provisions
Usage Sheet, and Cross Reference Sheet |
|
CL2006-10 |
08/29/2006 |
Circular Letter Electronic
Distribution |
|
CL2006-09 |
08/25/2006 |
Major Bridge Program |
|
CL2006-08 |
08/21/2006 |
Local Agency Financial
Statement Review |
|
CL2006-07 |
08/02/2006 |
Township Bridge Program |
|
CL2006-06 |
06/21/2006 |
Public Act 94-0763:
Designated Truck Route System |
|
CL2006-05 |
06/21/2006 |
2005 Joint Construction
Progress Review Program |
|
CL2006-04 |
06/21/2006 |
Federal Highway Earmarks
Guidelines |
|
CL2006-03 |
04/18/2006 |
Highway Jurisdiction
Guidelines for Highway and Street Systems |
|
CL2006-02 |
04/10/2006 |
Local Letting Procedures |
|
CL2006-01 |
02/03/2006 |
Responsible Bidder Protests
on Local Lettings |
|
CL2005-12 |
12/22/2005 |
Allocation of Surface
Transportation Program Rural (STR), State Matching
Assistance and Highway Bridge Program (HBP) Funds to the
Counties |
|
CL2005-11 |
12/08/2005 |
FY2007 Highway Safety
Improvement Program and High Risk Rural Roads Program |
|
CL2005-10 |
11/09/2005 |
Major Bridge Program |
|
CL2005-09 |
11/02/2005 |
2006 Special Provisions,
Usage Sheet, and Cross Reference Sheet |
|
CL2005-07 |
8/31/2005 |
Positive Protection for
Workers CD-ROM |
|
CL2005-06 |
8/08/2005 |
Township Bridge Program |
|
CL2005-05 |
7/12/2005 |
Qualification Based
Selection for Consultant Engineering Services |
|
CL2005-04 |
7/12/2005 |
Renumbering of BLR Forms |
|
CL2005-03 |
7/12/2005 |
Surplus Temporary New Jersey
Concrete Barriers |
|
CL2005-02 |
5/16/2005 |
2003 Illinois Manual on
Uniform Traffic Control Devices |
|
CL2005-01 |
4/15/2005 |
Bureau of Local Road and
Streets Manual |
|
CL2004-19 |
12/20/2004 |
Allocation of Surface
Transportation Program Rural (STR) Funds and State
Matching Assistance Funds to the Counties |
|
CL2004-16 |
12/08/2004 |
2004 Road, Bridge, and Other
Laws of Illinois |
|
CL2004-15 |
11/29/2004 |
Structure Information and
Procedure (SIP) Manual Revisions |
|
CL2004-14 |
11/18/2004 |
Major Bridge Program |
|
CL2004-11 |
08/06/2004 |
Township Bridge Program |
|
CL2004-07 |
04/26/2004 |
IRS W-9 Form |
|
CL2004-06 |
04/26/2004 |
Slow-Moving Vehicle Emblem |
|
CL2004-05 |
04/26/2004 |
Detectable Warnings for Curb
Ramps, and Other Locations |
|
CL2004-03 |
02/02/2004 |
Allocation of State Matching
Assistance Funds to the Counties |
|
CL2004-02 |
01/20/2004 |
Project Procedures Guide
Revision |
|
CL2003-19 |
12/31/2003 |
Allocation of Surface
Transportation Program Rural (STR) Funds |
|
CL2003-17 |
12/02/2003 |
Major Bridge Program |
|
CL2003-16 |
11/23/2003 |
Highway Bridge Replacement &
Rehabilitation Program (HBRRP) Soft Match Credit Program |
|
CL2003-11 |
08/25/2003
|
Public Act
0093-0032 - Permit Fees |
|
CL2003-10 |
08/08/2003
|
Township Bridge
Program |
|
CL2003-09 |
06/27/2003
|
Erosion and
Sediment Control Seminar |
|
CL2003-08 |
06/27/2003
|
Structures
Information Management System (SIMS) Survey |
|
CL2003-07 |
04/14/2003
|
Safety Vest |
|
CL2003-04 |
02/28/2003 |
Allocation of
STR Funds & State Matching Assistance Funds to the
Counties |
|
CL2003-03 |
02/06/2003 |
Roadway Weather
Info Web Site |
|
CL2003-02 |
01/10/2003 |
Erosion &
Sediment Control Seminar |
|
CL2002-24 |
01/07/2003
|
Major Bridge
Program |
|
CL2002-23 |
12/06/2002 |
2002 Road,
Bridge, and Other Related Laws of Illinois |
|
CL2002-21 |
10/21/2002
|
Township Bridge
Program Database |
|
CL2002-17
|
08/09/2002
|
Township
Bridge Program |
|
CL2002-14
|
07/05/2002
|
Storm Water
Phase II Guidance |
|
CL2002-09
|
05/24/2002
|
Subscription
Service |
|
CL2002-04
|
03/06/2002
|
Allocation
of STR Funds to the Counties |
|
CL2001-13
|
11/28/2001
|
Major Bridge
Program |
|
CL2001-10
|
08/14/2001
|
Township
Bridge Program |
|
CL2001-04
|
02/08/2001
|
Allocation
of STR and State Matching Assistance Funds to the
Counties
|
|
CL2001-03
|
01/31/2001
|
Expense
Rates for Publicly Owned Equipment |
|
CL2000-08
|
08/09/2000
|
Township
Bridge Program |
|
CL2000-02
|
01/18/2000
|
Allocation
of STR and State Matching Assistance Funds to the
Counties
|
|
CL1999-08
|
08/09/1999
|
Township
Bridge Program |
|
CL1999-05
|
03/05/1999
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1998-08
|
08/10/1998
|
Township
Bridge Program |
|
CL1998-05
|
04/07/1998
|
Allocation
of State Matching Funds |
|
CL1997-04
|
08/11/1997
|
Township
Bridge Program |
|
CL1997-01
|
02/11/1997
|
Allocation
of STR and State Matching Funds to Counties |
|
CL1996-12
|
07/26/1996
|
Township
Bridge Program |
|
CL1996-03
|
02/08/1996
|
Allocations
of STR and State Matching Funds to the Counties |
|
CL1995-15
|
11/07/1995
|
Metric "3R"
Policies |
|
CL1995-03
|
03/16/1995
|
Metric
Highway Design Update |
|
CL1994-22
|
12/23/1994
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1994-12
|
05/18/1994
|
Metric
Highway Design for Local Roads and Streets |
|
CL1994-04
|
01/25/1994
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1994-02
|
01/11/1994
|
State Truck
Route System |
|
CL1993-21
|
10/08/1993
|
PA 88-79 |
|
CL1993-19
|
08/06/1993
|
Township
Bridge Program |
|
CL1993-13
|
06/08/1993
|
Corrosion of
Traffic Signal Mast Arms |
|
CL1992-17
|
12/02/1992
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1992-15
|
08/03/1992
|
Township
Bridge Program |
|
CL1992-08
|
03/30/1992
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1991-14
|
08/01/1991
|
Township
Bridge Program |
|
CL1990-36
|
12/31/1990
|
Allocation
of FAS and State Matching Funds to the Counties |
|
CL1990-34
|
12/21/1990
|
Cold-Recycled Bituminous Concrete Using Bituminous
Materials |
|
CL1990-31
|
10/12/1990
|
Underwater
Inspection of Local Agency Bridges |
|
CL1990-23
|
07/27/1990
|
Township
Bridge Program |
|
CL1990-09
|
02/27/1990
|
Allocation
of FAS and State Matching Funds to the Counties |